BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2026 at 8:00 PM

Updated July 12, 2026

Renovation of a mixed-use development in San Antonio, Texas. Completed plans call for the renovation of a educational facility.

Question Deadline 07/14/2026 at 9:00 AM CT Location : online portal For information, call Veronica Velez or Valerie Hernandez at (210) 989-4800. SCOPE The selected contractor will be required to furnish all labor, materials, equipment, and supervision to complete the following at each building: Demolition (only areas that need repairs/improvement): Removal of the roofing materials, underlayment, and flashing down to the roof deck; Deck Inspection: Thorough inspection and assessment of the roof decking, Contractors should provide a recommendation for roof repairs and provide pricing for necessary replacement in needed areas; Installation: Installation of a [e.g., EPDM, TPO] roofing system in strict accordance with manufacturer specifications and local building codes; Ventilation: Installation of new [ e.g., ridge vents, soffit vents, intake/exhaust] to meet manufacturer warranty requirements; Flashing and Drip Edge: Replacement of metal flashing, drip edges, and boot covers, as necessary; Safety: Installation of any necessary safety measures; Electrical: All electrical disconnections for careful work around any telemetry or equipment on the roof and reconnects of said telemetry or equipment; Permits: If applicable, the Contractor is responsible for securing all required permits and coordinating inspections. Cost must be included in the proposal price Time of Work and Completion: The Contractor shall complete all work by December 31 , 2026. Any electrical work activities requiring power disconnection must be completed within (24) hours. The Contractor shall not discontinue work for more than five (5) consecutive calendar days without the prior written approval of District Staff. The work to be completed pursuant to this RFP will be scheduled between the hours of 7:00 am and 8:00 pm, Monday through Saturday, unless the Contractor obtains written permission from District staff. Waste Management: Daily site cleanup and lawful disposal of all roofing debris, including but not limited to removal and proper disposal of project debris and complete site restoration.

Sub-Bidding

$200,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
18
Bidding Soon
2,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.