Published August 4, 2026 at 8:00 PM

Updated August 9, 2026

Site work and new construction of a water / sewer project in Lino Lakes, Minnesota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Paul Hornby at 651-325-6849 and phornby@wsbeng.com Questions received less than seven days prior to the date for opening of Bids may not be answered. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows The furnishing of all labor, materials, tools, and equipment necessary to complete the, watermain, access road construction, restoration, and appurtenant work. The Project includes the furnishing of all labor and materials for the construction complete in - place, of the following approximate quantities 1 L S Construct Access Road 1 EACH Hydrant 6 L F 6 Watermain Ductile Iron CL 52 58 L F 16 Watermain Ductile Iron CL 50 339 L F 18 Watermain HDPE (Directional Drilled) 335 L F 30 HDPE Casing Pipe (Directional Drilled) 3200 L F Sediment Control Log Type Wood Fiber 1 LS Site Restoration The provisions of MINN . STAT . 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Lino Lakes shall comply with the provisions of the statute. The Contractor shall 1. Perform its work in such a manner as to cause the least interference with adjoining property owners and the general public. 2. Construct the work in a sequence that will allow the utility work to follow immediately upon the construction of the access roadway. All restoration work shall be completed within one week of utility construction and testing. 3. Limit the area under construction at any given time to minimize the impacts to adjoining properties. 4. Limit the area under construction to the area (s) indicated on the plans, unless approved by the Engineer. Under construction is defined as the time period from Contractor mobilization. 5. All proposed access and haul roads must be approved by the Engineer. The Contractor cannot utilize newly paved streets as haul roads. Any damage to existing streets due to unapproved construction use will be repaired at the Contractor's expense. Construction of watermain infrastructure including installation of 6 inch, 16 inch, and 18 inch watermain, hydrants, HDPE casing pipe, access road construction, sediment control, and site restoration.

Bid Results

$569,116.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
132
Bidding Soon
1,836
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2026

September 3, 2026

Project location map

Multiple Locations, Lino Lakes, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.