Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 11, 2026 at 8:00 PM
Updated September 17, 2026
Site work for a development in Red Fir, California. Completed plans call for site work for a development.
This acquisition is set aside exclusively for small business concerns under NAICS code 237310, and all responsible sources may submit a quotation for consideration. Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000. Questions shall be submitted via email to Tanya.Torres@usda.gov and are due no later than July15, 2026, at 11:00 AM Pacific Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. No questions will be accepted after this date and time. Location: Sequoia National Forest, California An organized site visit will not be held . PROJECT LOCATION This project is located in the State of California, Hume, Tulare, & Kern Counties, Sequoia National Forest, Hume Lake, Western Divide & Kern River Ranger Districts. The project includes six sites on the Hume Lake Ranger District, and ten sites on the Western Divide Ranger District, and three sites on the Kern River Ranger District. Kings River east of Pine Flat reservoir; at MP 0.23 of 13S23 Little Boulder starting from 14S02 Burton; Sites are located at MP 2.0, 2.4, and 3.09 of 12S01 Davis Road starting from the Bailey Bridge over the and at MP 9.57, 17.3 , and 17.4 of 21S94 Crawford starting from Tulare County Mtn Road 107 Western Divide Highway, and Hume Lake Trail at MP 0.02. (See Vicinity Map) DESCRIPTION OF WORK This project is located in the State of California, in Fresno, Tulare, and Kern County, Sequoia National Forest, Hume Lake, Western Divide, and Kern River Ranger Districts. The project includes six sites, including trail 28E05, on the Hume Lake Ranger District, ten sites on the Western Divide Ranger District, and three sites on the Kern River Ranger District. Furnish all labor, equipment, and material to accomplish the work under this task order. Incidental vegetation and slough removal as required for aggregate base and asphalt placement, rock wall construction, fill slope repairs, and other specified work. Remove slide/slough material from roadways and repair washouts on listed sites. Estimated volume of slide removal and washout repair is approximately 1837 CY for the base bid. Complete earthwork as outlined in drawings and work list. Recondition ditches where specified. Recondition Roadway as specified for surface replacement at multiple sites. Reconstruct 46 SY of Dry Stack rock retaining wall (approximately 82'L by 5' H). Place 315.3 tons of Aggregate at 16 sites for base bid. Place 82.7 tons of Asphalt at six sites for base bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
$597,778.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2026
August 3, 2026
Multiple Locations, Red Fir, CA
Related To This Project
Portola Valley, CA
Bid Date: Jul 16 2026
Santa Barbara, CA
--
San Diego, CA
--
San Clemente, CA
Bid Date: Aug 03 2026
Tehachapi, CA
Bid Date: Jun 30 2026
Inglewood, CA
--
Bodega Bay, CA
--
Los Angeles, CA
Bid Date: Jul 22 2026
Shafter, CA
Bid Date: Jul 10 2026
Oceanside, CA
Bid Date: Jul 31 2026
Poway, CA
Bid Date: Jul 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
