Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
Renovation of a communication facility in Collegeville, Pennsylvania. Completed plans call for the renovation of a communication facility.
A&I For EOC Radio Room HVAC Replacement And Renovation - HVAC The Heating, Ventilating and Air Conditioning/Mechanical ( HVAC) Contract includes the work of all systems components and all related work for complete and operating systems. Work under this prime Contract includes but is not limited to: Principal responsibilities as project coordinator affecting coordination of all trades. Administrative and coordination responsibilities Overall coordination of the work, except for the coordination required to be performed by others in accordance with Division 01 Section "Project Coordination". Development of the overall project schedule Equipment and accessories. e. Building specialties. h. Temporary Facilities in the HVAC Construction Contract: Temporary enclosures, storage trailers and individual contractor facilities as specified in the "Temporary Facilities" section Temporary Facilities and controls that are not specifically assigned to the GC or Electrical Contracts. Un-piped temporary toilets, wash facilities and drinking water facilities including disposable supplies. General waste disposal facilities including recycling (dumpsters) for use by all Prime Contractors. Temporary stairs. Temporary fire- protection equipment. Barricades, warning signs, and lights. Site staging enclosure fence. General cleaning of the building and project site during construction. Final cleaning. Selective removal, cutting and patching for the CRAC unit system. Coordinate with General Contactor for final finishing work. . Coordination with Owner and other contractors for temporary shut down of HVAC Equipment. Removal and Replacement of condensers & piping for HVAC equipment, as indicated. Duct work supply, return, exhaust and outdoor air systems and accessories. HVAC Contractor is responsible for the HVAC system operation, use charges and maintenance between activation of the system on the specified milestone date and Owner's acceptance at substantial completion. Obtaining an HVAC permit. Montgomery County PA is seeking qualified bids for the HVAC replacement and renovation at the County's Emergency Operations Center (EOC). Question Deadline 07/17/2026 at 10:00 AM ET Deadline to submit Questions via Online Portal
Sub-Bidding
$300,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
50 Eagleville Rd, Collegeville, PA
Related To This Project
Collegeville, PA
--
Collegeville, PA
Bid Date: Mar 26 2026
Collegeville, PA
Bid Date: Mar 11 2026
Collegeville, PA
--
Collegeville, PA
Bid Date: Feb 19 2026
Collegeville, PA
Bid Date: Feb 19 2026
Collegeville, PA
Bid Date: Feb 12 2026
Collegeville, PA
Bid Date: Mar 30 2021
Collegeville, PA
Bid Date: Jul 29 2021
Collegeville, PA
Bid Date: Jan 26 2021
Collegeville, PA
Bid Date: Oct 01 2025
Collegeville, PA
Bid Date: Aug 13 2025
Collegeville, PA
Bid Date: Jun 25 2025
Collegeville, PA
--
Collegeville, PA
Bid Date: May 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
