BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2026 at 8:00 PM

Updated July 9, 2026

Renovation of a communication facility in Collegeville, Pennsylvania. Completed plans call for the renovation of a communication facility.

A&I For EOC Radio Room HVAC Replacement And Renovation - HVAC The Heating, Ventilating and Air Conditioning/Mechanical ( HVAC) Contract includes the work of all systems components and all related work for complete and operating systems. Work under this prime Contract includes but is not limited to: Principal responsibilities as project coordinator affecting coordination of all trades. Administrative and coordination responsibilities Overall coordination of the work, except for the coordination required to be performed by others in accordance with Division 01 Section "Project Coordination". Development of the overall project schedule Equipment and accessories. e. Building specialties. h. Temporary Facilities in the HVAC Construction Contract: Temporary enclosures, storage trailers and individual contractor facilities as specified in the "Temporary Facilities" section Temporary Facilities and controls that are not specifically assigned to the GC or Electrical Contracts. Un-piped temporary toilets, wash facilities and drinking water facilities including disposable supplies. General waste disposal facilities including recycling (dumpsters) for use by all Prime Contractors. Temporary stairs. Temporary fire- protection equipment. Barricades, warning signs, and lights. Site staging enclosure fence. General cleaning of the building and project site during construction. Final cleaning. Selective removal, cutting and patching for the CRAC unit system. Coordinate with General Contactor for final finishing work. . Coordination with Owner and other contractors for temporary shut down of HVAC Equipment. Removal and Replacement of condensers & piping for HVAC equipment, as indicated. Duct work supply, return, exhaust and outdoor air systems and accessories. HVAC Contractor is responsible for the HVAC system operation, use charges and maintenance between activation of the system on the specified milestone date and Owner's acceptance at substantial completion. Obtaining an HVAC permit. Montgomery County PA is seeking qualified bids for the HVAC replacement and renovation at the County's Emergency Operations Center (EOC). Question Deadline 07/17/2026 at 10:00 AM ET Deadline to submit Questions via Online Portal

Sub-Bidding

$300,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,021
Active Projects
94
Bidding Soon
6,571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

50 Eagleville Rd, Collegeville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.