Published July 9, 2026 at 8:00 PM
Updated July 11, 2026
Site work and new construction of a water / sewer project in Milton, Vermont. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The Project generally consists of the installation of stormwater infiltration chambers in the Town's right of way at Sawyer Ave and Bear Trap & Cadreact Road , and related activities. The following items are included but may not be limited to the manpower, equipment, materials and incidentals necessary to complete the referenced work A. General Requirements - Site Work Contractor 1 ) At no additional cost to the Owner, the Site Work Contractor shall assume sole responsibility for construction methods and means. Methods and materials shall conform to the latest standards of the State of Vermont, the Town of Milton and all permits and approvals for the project. In the event of conflict, the more stringent specification will apply. 2) At no additional cost to the Owner, the Site Work Contractor shall be responsible for all work and materials shown or described in the specifications to make the work complete. Manufacturer's product specifications shall be submitted for all materials to the Engineer for approval prior to installation . This shall include all aggregates, topsoil , bituminous concrete and binder, EPSC products, pipe and any other specialty product proposed to complete the work. 3) The Site Work Contractor shall contact Dig Safe and other non-member utility companies prior to excavation, verify utility intersections, report potential conflicts to the Owner and Engineer and verify all temporary benchmarks before use. 4) At no additional cost to the Owner, it shall be the sole responsibility of the Site Work Contractor to protect workers and the public from any and all hazards connected with the construction work and to perform all work in conformance with OSHA and VOSHA Regulations. 5) All backfill, sheeting, shoring, dewatering, clearing, grubbing, off-site disposal of excavation, erosion control , erosion control maintenance, traffic control , grading , testing & disinfection and all incidentals shall be included as part of the Work. Installation of stormwater infiltration chambers within the Town right of way and related activities. Bonds: Bid Bond required (unspecified amount). Question Deadline 07/10/2026 at 5:00 PM ET
GC Bidding
$500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Multiple Locations, Milton, VT
Related To This Project
Milton, VT
Bid Date: May 01 2026
Milton, VT
Bid Date: Jun 04 2026
Milton, VT
Bid Date: May 11 2026
Milton, VT
Bid Date: Mar 30 2026
Milton, VT
Bid Date: Feb 27 2026
Milton, VT
Bid Date: Mar 04 2026
Milton, VT
Bid Date: Mar 04 2026
Milton, VT
Bid Date: Jan 16 2026
Milton, VT
Bid Date: Jan 02 2026
Milton, VT
Bid Date: Dec 19 2025
Milton, VT
Bid Date: Jul 15 2025
Milton, VT
--
Milton, VT
Bid Date: May 21 2025
Milton, VT
--
Milton, VT
Bid Date: Mar 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.