Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 11, 2026
Site work and renovation of a bridge / tunnel in Summit, Utah. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.
Rehabilitation of an existing rail car bridge including railing upgrades, bridge deck replacement, bearing seat upgrades, abutment upgrades, welding of railings and gates, vehicle approach modifications, abutment protection, and installation of signage. SCOPE OF WORK Summit County Lands and Natural Resources is seeking a qualified contractor to rehabilitate the existing rail car bridge that crosses East Canyon Creek near Big Bear Hollow, along East Canyon Road for public recreational pedestrian access and occasional emergency egress. Key elements of the rehabilitation include the following items and others as listed on the construction documents, Exhibit B. Items that must be addressed by the contractor in the proposal include but are not limited to railing upgrades, bridge deck replacement, bearing seat upgrades, abutment upgrades, welding of railings and gates, vehicle approach modifications, abutment protection and installation of associated signage, and description of recommended ongoing maintenance schedule, and anticipated/warrantied lifespan of end product. The bridge is intended for future public pedestrian access to the nearby trails and amenities in the area. Creating an access route for occasional Type 3 Engine wildland fire trucks is also a key objective for the bridge in the case of an emergency. The design as shown in the construction documents, Exhibit B, prepared by Ensign Engineering (Project No. 14503A) accomplishes these objectives and rehabilitates the bridge All inquiries or questions relating to this RFP must be addressed to Rachael Brard, Lands & Natural Resources Program and Project Manager, rbrard@summitcountyutah.gov. All communications regarding this RFP will be conducted through the query system in Bonfire, with the exception of the site visit RSVP. Phone calls or in person visits are prohibited. Do not directly contact the County Department or other County officers or employees Question Deadline 07/10/2026
GC Bidding
$1,500,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
East Canyon Road, Summit, UT
Related To This Project
Summit, UT
Bid Date: May 06 2025
Summit, UT
Bid Date: Oct 06 2020
Summit, UT
Bid Date: Nov 06 2025
Summit, UT
Bid Date: Feb 22 2024
Summit, UT
Bid Date: Aug 29 2023
Summit, UT
Bid Date: Apr 04 2023
Salt Lake City, UT
--
Saratoga Springs, UT
--
American Fork, UT
--
Eagle Mountain, UT
--
South Salt Lake, UT
--
North Salt Lake, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
