BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2026 at 8:00 PM

Updated July 21, 2026

Site work and new construction of a bridge / tunnel in Blair, Nebraska. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Sta. 12+25 Construction of a reinforced concrete box culvert and associated grading, specifically building a triple 12' x 9' x 46' double broken back concrete box culvert on 15 degree skew. The undersigned , having carefully examined the documents for construction of a reinforced concrete box culvert and associated grading, situated in Sections 2/3-T19N - R9E Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. STRUCTURE NO. C008900725 Completion-December 11 , 2026 Electronic submittals shall be submitted by email to the following address: matthew.welker@bowman.com

Award

$313,226.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
54
Bidding Soon
851
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

1555 Colfax Street, Blair, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.