Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated September 1, 2026

Site work and new construction of a municipal facility in Whitmore Lake, Michigan. Conceptual plans call for site work for a municipal facility; and for the construction of a municipal facility.

As of August 26, 2026 Project has been abandoned. No longer needed Excavate and remove all grass, topsoil, organic material, and unsuitable soils within the pad areas. 2. Compact the subgrade to provide a stable foundation. 3. Install a minimum 4-inch compacted crushed stone/gravel base beneath each pad. 4. Form and pour concrete pads measuring 8 feet by 6 feet by 6 inches thick. 5. Concrete shall be 3,500 PSI minimum compressive strength and air-entrained where exposed to freeze-thaw conditions. 6. Reinforce each slab with #4 reinforcing bars at 18 inches on center each way or 6x6 W2.9/W2.9 welded wire mesh, supported to remain within the middle third of the slab. 7. Finish surface with a broom finish for slip resistance and tool all exposed edges. 8. Provide a slope of approximately 1/8 inch per foot to promote positive drainage. 9. Install expansion joint material where the new concrete abuts existing structures or concrete surfaces. 10. Cure and protect concrete in accordance with industry standards and manufacturer recommendations Question Deadline 07/30/2026 at 12:00 AM ET

Project Abandoned

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
179
Bidding Soon
2,759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2026

August 31, 2026

Project location map

8350 Main St., Whitmore Lake, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed