Demolition, site work and new construction of an educational facility in Marlborough, Massachusetts. Completed plans call for the construction of a 161,800-square-foot, three-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.
This project consists of the construction of a new elementary school on the site of the existing Raymond C. Richer Elementary School, together with all associated site improvements and demolition of the existing school building. The proposed project consists of a three-story building comprised of 161,800 g.s.f., plus additional where the proposed building foundations are integrated into the sloping landscape. The project is envisioned as a multi-phased effort where the existing Richer Elementary School will remain operational throughout construction of the new building. The project will require significant planning and coordination of construction activities, school operations, site logistics, safety measures, and stakeholder communications. Due to the active school environment and limited available site area, construction staging and laydown operations will present logistical challenges. A second City-owned parcel located on Glen Street (Parcel 89-3C) will be made available for construction and/or school operational logistics, subject to applicable permitting requirements. The Construction Manager will be responsible for managing activities associated with this parcel, including restoration upon completion of the project and coordination with the Owner regarding operational impacts. The Construction Manager at Risk is anticipated to be selected in Fall 2026. Trade contractor bid packages are anticipated to be procured beginning in Summer 2027, with construction commencing in Fall 2027. Substantial completion of the new school building is anticipated by June 2029. Estimated Construction Duration: Approximately 32 months Qualification: DCAMM Certificate of Eligibility in the category of General Building Construction
GC Bidding
$128,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
80 Foley Rd, Marlborough, MA
Related To This Project
Supply and Delivery of Hydrofluorosilicic Acid to the John J. Carroll Water Treatment Plan - 6160008
Marlborough, MA
Bid Date: Jun 10 2026
Marlborough, MA
Bid Date: Jun 11 2026
Marlborough, MA
Bid Date: Jun 15 2026
Marlborough, MA
Bid Date: Jun 25 2026
Marlborough, MA
--
Marlborough, MA
Bid Date: Jun 15 2026
Marlborough, MA
Bid Date: Apr 23 2026
Marlborough, MA
Bid Date: Apr 29 2026
Marlborough, MA
--
Marlborough, MA
Bid Date: Apr 30 2026
Marlborough, MA
--
Marlborough, MA
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.