Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 29, 2026

Demolition, site work and new construction of an educational facility in Marlborough, Massachusetts. Working plans call for the construction of a 161,800-square-foot, three-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.

As of September 24, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. This project consists of the construction of a new elementary school on the site of the existing Raymond C. Richer Elementary School, together with all associated site improvements and demolition of the existing school building. The proposed project consists of a three-story building comprised of 161,800 g.s.f., plus additional where the proposed building foundations are integrated into the sloping landscape. The project is envisioned as a multi-phased effort where the existing Richer Elementary School will remain operational throughout construction of the new building. The project will require significant planning and coordination of construction activities, school operations, site logistics, safety measures, and stakeholder communications. Due to the active school environment and limited available site area, construction staging and laydown operations will present logistical challenges. A second City-owned parcel located on Glen Street (Parcel 89-3C) will be made available for construction and/or school operational logistics, subject to applicable permitting requirements. The Construction Manager will be responsible for managing activities associated with this parcel, including restoration upon completion of the project and coordination with the Owner regarding operational impacts. The Construction Manager at Risk is anticipated to be selected in Fall 2026. Trade contractor bid packages are anticipated to be procured beginning in Summer 2027, with construction commencing in Fall 2027. Substantial completion of the new school building is anticipated by June 2029. Estimated Construction Duration: Approximately 32 months Qualification: DCAMM Certificate of Eligibility in the category of General Building Construction Project No. 2021.10 Question Deadline 07/23/2026 at 2:00 PM ET

Final Planning

$128,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
877
Active Projects
379
Bidding Soon
6,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2026

June 23, 2027

Project location map

80 Foley Rd, Marlborough, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed