BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 12, 2026

Demolition, site work and new construction of a bridge / tunnel in Cascade Locks, Oregon. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and providing for partial demolition of the existing bridge. The new bridge will be a single-span steel girder bridge with a concrete deck. The bridge will be 34 feet 4 1/2 inches wide out-to-out and will include two 11-foot travel lanes, two 2-foot shoulders, and a 5-foot sidewalk. The superstructure will consist of four built-up steel plate girders. The replacement bridge will be located immediately downstream of the existing bridge. At its northern terminus, the alignment will fit between the existing bridge and the Bonneville Power Administration transmission tower located to the south. Approach roadways will be constructed to connect the new bridge to the existing roadway alignment. The new bridge will span the existing navigation channel and provide greater under-clearance than the existing bridge. The north abutment will be a concrete stub abutment with a spread footing anchored into rock. The south abutment will be a concrete abutment supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the construction work. The existing bridge provides critical vehicular access to the Bonneville project and must remain open throughout construction, requiring the work to be completed in phases. The work also includes lead and asbestos removal, compliance with environmental and seasonal restrictions, and barge crane lifting operations performed in close proximity to a high-voltage power line. MAGNITUDE OF CONSTRUCTION: BETWEEN $10,000,000.00 AND $25,000,000.00 Question Deadline 09/03/2026 All inquiries regarding this solicitation are to be submitted via online. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. project no- W9127N26BA0240002

GC Bidding

$25,000,000.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
62
Bidding Soon
1,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

December 7, 2026

Project location map

Dam Rd, Cascade Locks, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.