BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2026 at 8:00 PM

Updated July 21, 2026

Renovation of a residential development in Georgetown, Massachusetts. Completed plans call for the renovation of a residential development.

A. The Work under the Contract consists of 1. All Work is either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: New full-frame double-hung and casement windows at eleven (11 ) one- and two-story buildings. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. C. The Contractor's attention is directed to Article 3.3 of the General Conditions. D. Permits: See Article 3.16.1 of the General Conditions. E. Utility Back Charges: If applicable, see Article 3.16.5 of the General Conditions. F. Police Details: If applicable, see Article 3.16.6 of the General Conditions. G. The site/building and adjacent site/buildings will be occupied during construction unless otherwise noted in the Contract Documents. The Contractor shall take all necessary precautions to ensure the public safety and convenience of the occupants during construction. Whenever work is to be done inside occupied units, the Contractor's superintendent and an Awarding Authority's representative shall conduct a pre-work inspection of each unit to make note of existing conditions in the unit. Special attention should be paid to areas where new work will meet existing conditions. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The participation benchmark reserved for such enterprises shall not be less than 12.3% MBE, 11.2% WBE and 3% VBE The Project consists of but not limited to New full-frame double-hung and casement windows at eleven ( 11 ) one- and two-story buildings. The work is estimated to cost $410,000.00. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Sub-Bidding

$410,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
627
Active Projects
14
Bidding Soon
4,243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

23 Trestle Way, Georgetown, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.