Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 17, 2026 at 8:00 PM
Updated July 21, 2026
Renovation of a residential development in Georgetown, Massachusetts. Completed plans call for the renovation of a residential development.
A. The Work under the Contract consists of 1. All Work is either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: New full-frame double-hung and casement windows at eleven (11 ) one- and two-story buildings. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. C. The Contractor's attention is directed to Article 3.3 of the General Conditions. D. Permits: See Article 3.16.1 of the General Conditions. E. Utility Back Charges: If applicable, see Article 3.16.5 of the General Conditions. F. Police Details: If applicable, see Article 3.16.6 of the General Conditions. G. The site/building and adjacent site/buildings will be occupied during construction unless otherwise noted in the Contract Documents. The Contractor shall take all necessary precautions to ensure the public safety and convenience of the occupants during construction. Whenever work is to be done inside occupied units, the Contractor's superintendent and an Awarding Authority's representative shall conduct a pre-work inspection of each unit to make note of existing conditions in the unit. Special attention should be paid to areas where new work will meet existing conditions. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The participation benchmark reserved for such enterprises shall not be less than 12.3% MBE, 11.2% WBE and 3% VBE The Project consists of but not limited to New full-frame double-hung and casement windows at eleven ( 11 ) one- and two-story buildings. The work is estimated to cost $410,000.00. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
Sub-Bidding
$410,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
23 Trestle Way, Georgetown, MA
Related To This Project
Georgetown, MA
--
Georgetown, MA
Bid Date: Mar 26 2026
Georgetown, MA
--
Georgetown, MA
Bid Date: Oct 24 2025
Georgetown, MA
Bid Date: Mar 24 2026
Georgetown, MA
Bid Date: Oct 24 2019
Georgetown, MA
Bid Date: Oct 29 2020
Georgetown, MA
Bid Date: Mar 12 2026
Georgetown, MA
Bid Date: Aug 27 2025
Georgetown, MA
Bid Date: Jun 27 2025
Georgetown, MA
--
Georgetown, MA
Bid Date: Dec 23 2024
Georgetown, MA
Bid Date: Jul 01 2021
Georgetown, MA
Bid Date: Sep 20 2024
Georgetown, MA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
