Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 27, 2026 at 8:00 PM
Updated August 2, 2026
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Harrisburg, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for outdoor lighting for a road / highway; and water / sewer project.
The Project Consists of the Replacement of the Existing South Bridge With a Wider Bridge, Widened to the South, Full Depth Reconstruction of I-83 Between the South Bridge and Just East of the Exit 41a (Pa 581) Interchange, Reconfiguration of the I-83 Exit 41b (Lemoyne) Interchange, Replacement of the Existing South 3rd Street (Sr 2035) Bridge Over I-83 and the Norfolk Southern Railroad in Lemoyne Borough, Relocation of Lowther Street (Sr 2028) East of South 3rd Street in Lemoyne Borough, Replacement of the Front Street/2nd Street Interchange, Including the Viaduct (Bridge) From the Eastern End of the South Bridge to Cameron Street, and Construction of Associated Stormwater Management, Lighting, Signage, and Noise Barriers. The Eastern End of the I-83 South Bridge Project is the I-83 Front Street/2nd Street Interchange, Which Includes the Viaduct From the Eastern End of the South Bridge to Cameron Street. The Western End of the I-83 South Bridge Project is Immediately East of the I-83/Pa-581 Interchange State Route 0083, Section 094, in Dauphin County, City of Harrisburg and Cumberland County, Lemoyne Borough, From a Point in Cumberland County 4,368.94 Feet West of Norfolk Southern Tracks at Segment 0410/0411 Offset 0992/1362 to a Point in Dauphin County 150 Feet West of Cameron Street at Segment0430/0431 Offset 0012/0014, for an Overall Project Length of 16,127.87 Linear Feet (3.055 Miles). Project Cost Range: $1,000,000,000.00 - $1,099,999,999.99 Federal Project Status: Federal Oversight Structure Work: 73.00% Pre-bid Meeting: Mandatory Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. In compliance with the Americans with Disabilities Act of 1990, the Department has scheduled the pre-bid conference at a facility which is accessible to persons having disabilities. Any person having special needs or requiring special assistance is requested to contact Marwa Said, P.E. at msaid@pa.gov or (717) 743-1005 by August 12, 2026, in order that special needs may be accommodated and/or assistance provided. Direct all questions regarding the pre-bid conference to Marwa Said, P.E. at msaid@pa.gov or (717) 743-1005. PennDOT - I-83 South Bridge Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
$1,100,000,000.00
Public - State/Provincial
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2026
January 4, 2027
I-83, Harrisburg, PA
Related To This Project
Harrisburg, PA
Bid Date: Aug 17 2026
Harrisburg, PA
Bid Date: Jul 29 2026
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Harrisburg, PA
--
Project No. 2026-204 Advanced Wastewater Treatment Facility (AWTF) Truck Scale Replacement - 6198125
Harrisburg, PA
Bid Date: Jul 31 2026
Harrisburg, PA
Bid Date: Jul 17 2026
Harrisburg, PA
Bid Date: Jul 30 2026
Harrisburg, PA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
