Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 14, 2026

Site work for a medical facility in San Diego, California. Completed plans call for site work for a medical facility.

This project installs a soil remediation system at UC San Diego Hillcrest Medical Center, southwest of the existing Central Plant with the objective of reducing groundwater hydrocarbon levels to the threshold specified by the Regional Water Quality Control Board. The soil remediation system consists of a dual phase extraction (DPE) system, which includes soil vapor extraction (SVE) and fluid (groundwater) treatment. Existing monitoring wells in the canyon will be connected to an Owner procured skid-mounted remediation system via mostly above ground pipes. The project also proposes to redrill one existing monitoring well. Bid Security in the amount of ten percent (10%) of the Lump Sum Base Bid, excluding alternates, shall accompany each Bid. The Surety issuing the Bid Bond shall be, on the Bid Deadline, listed in the latest published State of California, Department of Insurance, list of Insurers Admitted to Transact Surety Insurance in This State. Estimated project duration is 180 calendar days. The following bidders have been prequalified to bid on this project: AMERICAN INTEGRATED SERVICES, INC. GRAYMAR ENVIRONMENTAL SERVICES, LLC. INTEGRATED DEMOLITION AND REMEDIATION INC. Award is subject to final approval.

Award

$1,279,400.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
116
Bidding Soon
1,687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2026

August 28, 2026

Project location map

200 W Arbor Dr, San Diego, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed