BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 12, 2026

Site work for a mixed-use development in Fort Leonard Wood, Missouri. Conceptual plans call for site work for a medical facility.

The work consists of demolition, decommissioning, and site improvements at the former General Leonard Wood Army Community Hospital and associated facilities. This includes complete removal of the hospital and clinic (B310), Central Utility Plant (B311), temporary helipad, fuel tanks, utilities, paving, communications infrastructure, and all related site features, along with abatement and disposal of asbestos-containing materials and other regulated materials. The project requires disconnection and capping of utilities, full debris removal, and restoration of the site, including backfilling and turf establishment. Extensive decommissioning activities are required for medical gas systems, low-voltage systems, HVAC systems, wastewater and laboratory systems, fire suppression systems, hydraulic elevators, and diesel fuel systems, including draining, purging, removal of equipment, and proper disposal of hazardous and regulated substances. Work also includes Phase 2 modifications to the Optical Fabrication Laboratory and Medical Warehouse, consisting of demolition of the west wall at the mechanical, electrical, and plumbing room, removal of all MEP equipment, capping of roof penetrations, and construction of a new exterior wall. Additional improvements include installation of an ADA-compliant entrance vestibule, a new egress corridor, and lightning protection tied to a ground loop system, while maintaining ongoing operations of the facility. Site improvements encompass grading, parking, sidewalks, landscaping, lighting, wayfinding, video surveillance, storm drainage, and traffic management, with requirements to maintain parking capacity and ensure continuous safe pedestrian access during construction. The magnitude of this project is between $35M and $95M The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$95,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
2
Bidding Soon
599
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

4234 Illinois Ave, Fort Leonard Wood, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.