Published July 10, 2026 at 8:00 PM
Updated July 12, 2026
Site work for a mixed-use development in Fort Leonard Wood, Missouri. Conceptual plans call for site work for a medical facility.
The work consists of demolition, decommissioning, and site improvements at the former General Leonard Wood Army Community Hospital and associated facilities. This includes complete removal of the hospital and clinic (B310), Central Utility Plant (B311), temporary helipad, fuel tanks, utilities, paving, communications infrastructure, and all related site features, along with abatement and disposal of asbestos-containing materials and other regulated materials. The project requires disconnection and capping of utilities, full debris removal, and restoration of the site, including backfilling and turf establishment. Extensive decommissioning activities are required for medical gas systems, low-voltage systems, HVAC systems, wastewater and laboratory systems, fire suppression systems, hydraulic elevators, and diesel fuel systems, including draining, purging, removal of equipment, and proper disposal of hazardous and regulated substances. Work also includes Phase 2 modifications to the Optical Fabrication Laboratory and Medical Warehouse, consisting of demolition of the west wall at the mechanical, electrical, and plumbing room, removal of all MEP equipment, capping of roof penetrations, and construction of a new exterior wall. Additional improvements include installation of an ADA-compliant entrance vestibule, a new egress corridor, and lightning protection tied to a ground loop system, while maintaining ongoing operations of the facility. Site improvements encompass grading, parking, sidewalks, landscaping, lighting, wayfinding, video surveillance, storm drainage, and traffic management, with requirements to maintain parking capacity and ensure continuous safe pedestrian access during construction. The magnitude of this project is between $35M and $95M The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
$95,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
4234 Illinois Ave, Fort Leonard Wood, MO
Related To This Project
Fort Leonard Wood, MO
--
Fort Leonard Wood, MO
Bid Date: Jun 26 2026
Fort Leonard Wood, MO
--
Fort Leonard Wood, MO
Bid Date: May 16 2026
Fort Leonard Wood, MO
--
Fort Leonard Wood, MO
Bid Date: Apr 15 2026
Fort Leonard Wood, MO
Bid Date: Dec 29 2025
Fort Leonard Wood, MO
--
Fort Leonard Wood, MO
Bid Date: Aug 26 2025
Fort Leonard Wood, MO
Bid Date: Apr 15 2026
Fort Leonard Wood, MO
Bid Date: Aug 04 2025
Fort Leonard Wood, MO
Bid Date: Aug 29 2025
Fort Leonard Wood, MO
--
Fort Leonard Wood, MO
Bid Date: Jul 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.