Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 11, 2026 at 8:00 PM
Updated August 17, 2026
Site work and paving for a bridge / tunnel in Fort Walton Beach, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
FINANCIAL PROJECT ID(S): 451086-4-52-01 and 451086-3-52-01 Limits: 57030000 Total Roadway Length: 1.226 Miles Contract Days: 375 Total Bridge Length: 1.274 Miles Total Proposal Length: 2.500 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Flexible Description: The Improvements under this District Contract consist of FPID 451086-4-52-01 for the Bridge Repair of Spalled Areas, Crack Repairs, Expansion Joints, Cathodic Protection, Bearing Pad Repairs, and Slope Protection and FPID 451086-3-52-01 for replacing the existing fender system "n-kind" with steel HP piles and composite lumber wales for SR 30 (US 98) OVER EAST PASS BRIDGE NOS. 570082 & 570054 in Okaloosa County Pre-qualification is Required to Bid on This Project. Marine General Liability Insurance as Referenced in Section 7-13.5 of the Fdot Standard Specifications May Be Required if Any Work Under This Contract is Performed Using Vessel(S)*. Prior to the Contract Execution, Contractor Shall Provide Written Certification to the Department if No Vessel(S) Will Be Used for the Work. Vessel: A Watercraft or Other Artificial Contrivance, Whether Motorized or Non-motorized, Used to Perform Some or All of the Work, As Well as Any Incidental Work Related to the Project, Which Includes, but is Not Limited to, Barges, Dredges, Mobile Offshore Drilling Units, Floating Cranes, Tugboats, Ferries, and Any Watercraft Used to Transport Construction Workers, Materials, or Equipment at the Project. Question Deadline 08/06/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 002 - RR Intermediate Bridges - SR 30 (US 98) Proposal Budget Estimate is $ 13,358,653.00
GC Bidding
$18,844,253.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2026
October 19, 2026
FL-30, Fort Walton Beach, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
