Published August 12, 2026 at 8:00 PM

Updated August 20, 2026

Site work, paving, renovation and addition to a playground / park / athletic field in Fort Walton Beach, Florida. Completed plans call for the addition of a playground / park / athletic field; for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Expansion of parking facilities at John Beasley Park and Marler Park, including associated site work. Locations- John Beasley Park: 1550 Miracle Strip Pkwy SE, Fort Walton Beach, FL 32548 Marler Park: 1275 Santa Rosa Boulevard, Fort Walton Beach, FL, 32548 This proposal includes services for two separate park improvement projects. While both projects are being submitted and evaluated as a combined proposal , each project shall be identified, budgeted, and tracked independently. LAST DAY FOR QUESTION: Tuesday, August 4, 2026 at 3:00 pm as per Adda 1. This proposal includes services for two separate park improvement projects. While both projects are being submitted and evaluated as a combined proposal , each project shall be identified, budgeted, and tracked independently. Cost estimates shall follow the format and structure of the pricing proposal table. Any shared project management or coordination efforts shall be allocated appropriately between the two projects and clearly identified. The two park projects shall be designed and implemented concurrently whenever feasible. The overall project schedules shall be coordinated such that: Construction activities for both parks proceed simultaneously or substantially overlap. Final completion of the two projects shall occur within two (2) weeks of each other. Project milestones, including design, permitting, bidding, and construction administration, shall be coordinated to maintain consistent progress across both sites. Both projects must achieve completion no later than March 15, 2027. Please provide a representative construction schedule based on a construction start date of November 1 , 2026. Phase 1 Improvements within the first designated work area. Phase 2 Remaining portions of the park shall remain open and accessible to the public. Temporary barriers, signage, and pedestrian routing shall be provided as required. Improvements within the second designated work area. Areas completed in Phase 1 shall be reopened for public use whenever practical. Public access shall be maintained to the greatest extent possible throughout construction. The phasing plans shall be developed to ensure: John Beasley and Ross Marler Parking Expansion Continuous public access to portions of each park. Safe separation between construction activities and park users. Efficient sequencing of work to minimize overall construction duration.

Post-Bid

$4,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
61
Bidding Soon
829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

November 1, 2026

Project location map

Multiple Locations, Fort Walton Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.