Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 12, 2026 at 8:00 PM
Updated August 20, 2026
Site work, paving, renovation and addition to a playground / park / athletic field in Fort Walton Beach, Florida. Completed plans call for the addition of a playground / park / athletic field; for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.
Expansion of parking facilities at John Beasley Park and Marler Park, including associated site work. Locations- John Beasley Park: 1550 Miracle Strip Pkwy SE, Fort Walton Beach, FL 32548 Marler Park: 1275 Santa Rosa Boulevard, Fort Walton Beach, FL, 32548 This proposal includes services for two separate park improvement projects. While both projects are being submitted and evaluated as a combined proposal , each project shall be identified, budgeted, and tracked independently. LAST DAY FOR QUESTION: Tuesday, August 4, 2026 at 3:00 pm as per Adda 1. This proposal includes services for two separate park improvement projects. While both projects are being submitted and evaluated as a combined proposal , each project shall be identified, budgeted, and tracked independently. Cost estimates shall follow the format and structure of the pricing proposal table. Any shared project management or coordination efforts shall be allocated appropriately between the two projects and clearly identified. The two park projects shall be designed and implemented concurrently whenever feasible. The overall project schedules shall be coordinated such that: Construction activities for both parks proceed simultaneously or substantially overlap. Final completion of the two projects shall occur within two (2) weeks of each other. Project milestones, including design, permitting, bidding, and construction administration, shall be coordinated to maintain consistent progress across both sites. Both projects must achieve completion no later than March 15, 2027. Please provide a representative construction schedule based on a construction start date of November 1 , 2026. Phase 1 Improvements within the first designated work area. Phase 2 Remaining portions of the park shall remain open and accessible to the public. Temporary barriers, signage, and pedestrian routing shall be provided as required. Improvements within the second designated work area. Areas completed in Phase 1 shall be reopened for public use whenever practical. Public access shall be maintained to the greatest extent possible throughout construction. The phasing plans shall be developed to ensure: John Beasley and Ross Marler Parking Expansion Continuous public access to portions of each park. Safe separation between construction activities and park users. Efficient sequencing of work to minimize overall construction duration.
Post-Bid
$4,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2026
November 1, 2026
Multiple Locations, Fort Walton Beach, FL
Related To This Project
Fort Walton Beach, FL
Bid Date: Aug 26 2026
Fort Walton Beach, FL
Bid Date: Sep 16 2026
Fort Walton Beach, FL
Bid Date: Sep 01 2026
Fort Walton Beach, FL
Bid Date: Aug 20 2026
Fort Walton Beach, FL
Bid Date: Aug 11 2026
Fort Walton Beach, FL
Bid Date: Aug 13 2026
Fort Walton Beach, FL
--
Fort Walton Beach, FL
Bid Date: Jul 15 2026
Fort Walton Beach, FL
Bid Date: Jul 08 2026
Fort Walton Beach, FL
Bid Date: Jul 09 2026
Fort Walton Beach, FL
Bid Date: Jun 23 2026
Fort Walton Beach, FL
Bid Date: Jul 23 2026
Fort Walton Beach, FL
Bid Date: Jun 18 2026
Fort Walton Beach, FL
Bid Date: Jun 19 2026
Fort Walton Beach, FL
Bid Date: Apr 30 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
