Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 16, 2026 at 8:00 PM
Updated July 19, 2026
Site work, paving and renovation of a water / sewer project in Midway, Utah. Completed plans call for the renovation of a water / sewer project; for paving for a water / sewer project; and for site work for a water / sewer project.
Installation of approximately 2,720 LF of 12-inch waterline, 2,030 LF of 12-inch waterline, 500 LF of 8-inch waterline, and 1,640 LF of 12-inch waterline. Scope includes asphalt, sidewalk, and curb and gutter replacements due to utility installation. The Homestead High Pressure Waterline replacement includes approximately 2,720 linear feet (LF) of 12-inch waterline to replace an aging portion of waterline through the golf course. Replacement will begin at the PRV station along Cari Lane, head east to Homestead Drive, then south to Bluff Road. The project will also include asphalt, sidewalk, and curb and gutter replacements where disturbed by waterline installation. Homestead Drive is a UDOT highway. The Homestead Reduced High Pressure Waterline replacement includes approximately 2,030 LF of 12-inch waterline to replace an aging 15-inch waterline along Homestead Drive. Replacement will begin near the intersection of Cari Lane and Homestead Drive and continue along Homestead Drive through the intersection with Bluff Road. This system also includes the replacement of approximately 500 LF of aging 8-inch waterline along Lime Canyon Road with new 8-inch waterline. The project will also include asphalt, sidewalk, and curb and gutter replacements where disturbed by waterline installation. Homestead Drive is a UDOT highway. The Cottages on Green Feed Line replacement includes approximately 1,640 LF of 12-inch waterline to replace another aging portion of waterline through the golf course. Replacement will begin at the booster pump station along Warm Springs Drive, head north to Snake Creek Road, then west along Snake Creek Road before crossing private property to Links Drive. The project will also include asphalt and curb and gutter replacements where disturbed by waterline installation. The intersection of Warm Springs Drive and Homestead Drive / Snake Creek Road is a UDOT highway.
GC Bidding
$1,500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Homestead Dr, Midway, UT
Related To This Project
Midway, UT
Bid Date: Jun 09 2026
Midway, UT
Bid Date: Apr 09 2026
Midway, UT
--
Midway, UT
Bid Date: Jan 08 2026
Midway, UT
Bid Date: Oct 21 2025
Midway, UT
Bid Date: Sep 11 2025
Midway, UT
Bid Date: Apr 28 2021
Midway, UT
Bid Date: Jul 08 2025
Midway, UT
Bid Date: Apr 09 2025
Midway, UT
Bid Date: Mar 20 2025
Midway, UT
--
Midway, UT
Bid Date: Feb 20 2025
Midway, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
