BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 25, 2026 at 8:00 PM

Updated August 3, 2026

Demolition, site work, new construction and renovation of a municipal facility in Romeo, Michigan. Completed plans call for the construction of a municipal facility; for the renovation of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

Reference Number 0000430769 Question Deadline 07/29/2026 at 4:00 PM ET Submit all questions to Engineer at: Maria Corona (Hubbell, Roth & Clark, Inc.) mcorona@hrcengr.com Installation of new Standby Engine-Generator and Automatic Transfer Switch, conduits, wiring, remote monitoring panel, natural gas service upgrade, electrical service upgrade, replacement of lighting panel and sub-fed panel, interior wall repair and painting, and demolition of existing generator, ATS, and concrete foundation. At the Village of Romeo City Hall, provide and install a new Standby Engine-Generator and Automatic Transfer Switch, with all required conduits, wire, remote monitoring panel, upgraded Semco Energy Co. natural gas service, and upgraded DTE Energy Co. electrical service. New Work shall also include replacement of the existing lighting panel and sub-fed panel with a new Lighting Panel, including reconnection of all existing conduit and wire to the new lighting panel, located inside the building, all materials required for installation of new equipment, repair, and re-painting interior walls as required, demolition and removal of the existing generator, ATS, and concrete foundation. All work shall be as described on the Drawings. Work shall include coordination with both DTE Energy Company for the Electrical Service and Semco Energy for the Natural Gas Service

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
165
Bidding Soon
2,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

October 4, 2026

Project location map

Multiple Locations, Romeo, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.