Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 18, 2026 at 8:00 PM
Updated September 25, 2026
Renovation of a mixed-use development in Marion, Indiana. Completed plans call for the renovation of a medical facility; and medical facility.
5.1 . Project Deliverables: The project will produce the following key deliverables 5.1.1 . Deliverable 1 : Contractor will provide two (2) R4-111- FIXED SPEED 4- 11KW Compressors 5.1.2. Deliverable 2: : Contractor will provide two (2) R4 Premium Efficiency Rotary Screw Compressor- 145 PSIg- Total Air System 5.1.3. Deliverable 3: Contractor will provide two (2) Drive motor 208-230/460V 60Hz with Star Delta Starter 5.1.4. Deliverable 4: Contractor will provide two (2) Coolant: Factory Filled with Ultra Coolant 5.1.5. Deliverable 5: Contractor will provide two (2) 80 Gallon Tank Mounted 5.1.6. Deliverable 6: Contractor will provide two (2) Controller: XE-70M Microprocessor Controller 5.1.7 . Deliverable 7: Contractor will provide two (2) Low sound enclosure 5.1.8. Deliverable 8: Contractor will provide two (2) PORO 5.1.9. Deliverable 9: Contractor will provide two (2) Start up kits 5.2. Services: The following services will be provided as part of this project: 5.2.1 . Service 1 : Contractor will then install and start up both RA-111 -FIXED SPEED 4-11KW Compressors at the Marion Boiler Plant in Building 76. Remove and replace the existing air compressor at the Marion VA Medical Center. Work includes furnishing all labor, materials, equipment, supervision, and related services necessary to remove the existing air compressor, install the replacement unit, and perform all associated work required to place the system into proper operating condition. Location: Marion VA Medical Center, Building 76 Boiler Plant, 1700 East 38th Street, Marion, IN 46953, United States. Period of Performance: Start Date: The project will commence by October 1, 2026. End Date: The project is expected to be completed by October 31, 2026. Questions: All questions must be submitted in writing and emailed to timothy.garrity@va.gov. Questions must be received no later than, 9-08-2026 4:00pm EST Time 3 calendar days prior to the closing of the solicitation. The Government reserves the right to not answer questions not meeting this timeline. All responses to questions will be incorporated into a written amendment.
Post-Bid
$400,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2026
October 1, 2026
1700 E 38th St, Marion, IN
Related To This Project
Marion, IN
Bid Date: Aug 17 2026
Marion, IN
Bid Date: Aug 21 2026
Marion, IN
Bid Date: Sep 01 2026
Marion, IN
Bid Date: Aug 24 2026
Marion, IN
Bid Date: Sep 15 2026
Marion, IN
Bid Date: Sep 15 2026
Marion, IN
Bid Date: Sep 16 2026
Marion, IN
Bid Date: Oct 07 2026
Marion, IN
Bid Date: Aug 21 2026
Marion, IN
Bid Date: Jul 23 2026
Marion, IN
--
Marion, IN
Bid Date: Apr 21 2026
Marion, IN
Bid Date: Apr 21 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed