Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2026 at 8:00 PM

Updated August 25, 2026

Renovation of an educational facility in Mount Pleasant, Utah. Completed plans call for the renovation of a educational facility.

Turnkey replacement of the existing hydronic heating boiler system including removal of existing equipment, installation of two high-efficiency condensing boilers, associated mechanical, electrical, venting, controls, BAS integration, startup, commissioning, training, and warranty documentation. Question Deadline 08/03/2026 at 5:00 PM MT

Award

$237,827.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2026

August 21, 2026

Project location map

579 S 400 E, Mount Pleasant, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed