BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 27, 2026

Site work for a civil project in Yakima, Washington. Completed plans call for site work for a water / sewer project.

The project consists of the installation of a new septic system, to include new tanks, transport lines, pumps and control panel, electrical connections and drain field. For this project, bids will ONLY be received and accepted via the online electronic bid service through online Complete digital project documents are available at online and also for advertisement purposes at Builders Exchange website. A contractor may view the contract documents at no cost prior to becoming a Planholder. Input the online project number 10288266 on the website's projects search page to download the digital documents for $22.00. Project bid documents must be downloaded from online which will add your company to the Planholder List and allow access to vBid online bidding for the submittal of your bid (which is required for this project). Bidders will NOT be charged a fee of $42.00 to submit a bid electronically. For this project, bids will ONLY be received and accepted via the online electronic bid service through online A PREBID CONFERENCE IS SCHEDULED FOR AUGUST 3 , 2026 AT 11:00 A.M. ON SITE . Prebid Location: 9571 North Fork Road , Yakima, WA 98903 Prebid Directions: From Yakima: Take Hwy 82 to Exit 131A for US 12 West. In 2.1 miles, take the exit for N 40th Ave/Fruitdale Boulevard. Continue on N 40th Ave for 3 miles and turn right one W Washington Ave. In 1 mile, turn left onto S52nd Ave. In 1 miles, turn right on Ahtanum Rd. In 14 miles, at the fork in the road with a fire station and church on the right, turn right onto N Fork Rd. In 10 miles, the paved road ends at the Ahtanum Fire Camp on the right From US 12 E: Go South on S Naches Rd , which becomes Naches Rd/Summitview Rd. Follow Summitview Rd for 7 miles and turn right onto N 96th Ave. In 13 miles, turn right onto W Wise Hollow Rd, then left onto Dazet Rd. In 1.3 miles, turn right onto Occidental Rd , then left onto Draper Rd. Draper Rd becomes S Wiley Rd Conn . Turn right onto Ahtanum Rd. In 10.8 miles, at the fork in the road with a fire station and church on the right, turn right onto N Fork Rd. In 10 miles, the paved road ends at the Ahtanum Fire Camp on the right

GC Bidding

$152,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
30
Bidding Soon
940
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

September 14, 2026

Project location map

9571 N Fork Rd, Yakima, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.