BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated July 24, 2026

Site work for a mixed-use development in Hinton, Alberta. Conceptual plans call for site work for a playground / park / athletic field.

The work to be accomplished under this project includes: .1 Access road upgrades .2 Enhance staging area at the west PLUZ Boundary with vault toilet installation .3 Campground area and trail loop .4 Day use area .5 Lookout point .6 Campground Loop Trail .7 Spring Fling Loop .8 Wolf Ridge Trail .9 Upgrade signage using Alberta Forestry & Parks standard sign catalogue as needed. TIMELINE: Request for Proposals from engineering consultants is currently underway. Construction is planned for May 2027 - July 2028. Further update may be available in fall 2026.

Conceptual

$2,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
12
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2027

Project location map

AB-40, Hinton, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.