BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2026 at 8:00 PM

Updated August 14, 2026

Site work and new construction of a clubhouse / community center in Los Angeles, California. Completed plans call for the construction of a 50,000-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Please see the attached Notice to Contractors Question Deadline 09/04/2026 at 5:00 PM PT Direct Questions via E-Mail to Jenni Cox at jenni.cox@csun.edu The new USU Gateway Building is anticipated to be a 45,000-50,000 GSF building and will replace the existing Southwest Addition (SWA) and the Old Mercantile Buildings (OMB). The building will strengthen the physical and visual connection between the University Student Union complex and the broader CSUN campus, creating a more welcoming and active transition between the two environments. The Gateway Building will include expanded dining and seating areas, office and program space for Associated Students and the Matador Involvement Center, conference and meeting space, and a new Rise Center concept that brings together multiple student resource centers within a shared facility while preserving dedicated space for each organization. Collectively, these uses are intended to create a highly active and welcoming destination that supports student engagement, involvement, leadership development, and student success. The preliminary anticipated design-build maximum acceptance cost for the USU Gateway is $80,000,000. The maximum acceptance cost is defined as the total cost of the design-build agreement, including all design, engineering, construction, materials, labor, escalation, insurance, bonds, design-builder contingency, and design-builder fees. The final design-build maximum acceptance cost for the Project will be published in the RFP

GC Bidding

$1,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
237
Bidding Soon
3,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2026

October 28, 2026

Project location map

18111 Nordhoff St, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.