BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2026 at 8:00 PM

Updated July 30, 2026

Site work for a sidewalk / parking lot in Wenatchee, Washington. Completed plans call for site work for a sidewalk / parking lot.

The project involves providing improved access to the Pybus South Parking Lot to accommodate Electric Vehicle Chargers funded by Washington's Climate Commitment Act. The work includes grading the entire site to final subgrade elevations along Worthen Street south of Orondo Street. Construction includes underground utility preparation for electric charging units and future development, installation of Chelan PUD primary electrical line extension for a 480V 3 Phase transformer, purchasing and installing a 1200A switchboard compatible with PUD metering, purchasing a 600A panel board cabinet, and preparing foundations for electric vehicle chargers to be installed by others. The scope also includes preparing a 120V lighting control cabinet for future parking lot lighting. All work must be completed in accordance with the contract plans, special provisions, and the 2026 WSDOT Standard Specifications. The Engineer's estimated range of probable cost is $530,000 to $590,000. Question Deadline 07/29/2026 Requests for interpretation or explanation shall be provided in writing and addressed to: Donald Nelson P.E. Sr. Project Engineer City of Wenatchee dnelson@wenatcheewa.gov (509) 888-3255 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$590,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
26
Bidding Soon
474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

September 4, 2026

Project location map

101 S Worthen St, Wenatchee, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.