Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and paving for a road / highway in West Allis, Wisconsin. Completed plans call for site work for a road / highway.

The work on S. 49th Street includes restoration, traffic control, erosion and dust control, pavement sawing, milling pavement, concrete base repair, driveway pavement removal, concrete curb and gutter removal and installation, dense graded base, concrete driveway, bituminous concrete surface, manhole adjustment, storm inlet adjustment and rehabilitation, valve adjustment, sanitary and storm sewer spot repairs, storm CIPP sectional liners, lighting unit and wiring removal, street lighting installation, electrical wiring for lighting, installation of speed humps and associated pavement markings, and installation of signs and posts. Alternate work includes similar improvements for 48th-49th Street Alley (Alternate A), 45th Street Alley (Alternate B), and Miller Park Way (Alternate C), with scopes varying in quantities and components described in detail. Bidders must submit bids electronically, accompanied by the required bid security, and must complete all bid form blanks for acceptance. The Village reserves the right to reject any and all bids, waive informalities not involving price, time or changes in the work, and to accept the bid that best serves the Village's interests. IN: S. 49th STREET FROM: W. GREENFIELD AVE. TO: NATIONAL AVE. AND VARIOUS OTHER LOCATIONS Proposals are solicited by the Village of West Milwaukee, hereinafter known as the Owner, for the S. 49TH Street Improvements Project in the above-described locations. Prospective bidders should visit the sites of the proposed work which will be performed to familiarize themselves with the conditions prevailing at the locations where work will be performed. The work will include the furnishing of all labor, materials, equipment, tools, supplies, services, etc., required for the complete installation of the S. 49TH Street Improvements Project. Award is subject to final approval.

Award

$315,311.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
170
Bidding Soon
2,787
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

September 19, 2026

Project location map

Multiple Locations, West Allis, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed