Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 19, 2026 at 8:00 PM
Updated August 26, 2026
Site work, new construction and renovation of a civil project in Busti, New York. Working plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
https://dec.ny.gov/news/environmental-notice-bulletin/2026-08-12/seqr/town-of-busti-town-of-busti-water-district-improvement-project Negative Declaration Chautauqua County - The Town of Busti, as lead agency, has determined that the proposed Town of Busti Water District Improvement Project will not have a significant adverse environmental impact. Currently, this portion of Town of Busti Water District No. 7 does not have municipal service, forcing all residential, commercial, and Town-owned facilities to rely on private groundwater wells. The Chautauqua County Department of Health strongly supports this project, noting that many local wells fail to meet NYSDOH standards due to recurring contamination and poor water quality. The action involves connecting this portion of Water District No. 7 to the Jamestown Board of Public Utilities (BPU) system. The project will also involve the installation of new water main, construction of a new water storage tank, and upgrades to an existing pump station. The project is located along Lawson Road, Mill Road, and Busti-Sugar Grove Road in the Town of Busti, New York. Primary Contact Jesse Robbins Town of Busti 125 Chautauqua Avenue Lakewood, NY 14750 Phone: (716) 488-0005 jrobbins@townofbusti.com ___________________________________________________________________________ This is to give notice that the Town of Busti has conducted an evaluation as required by Executive Order 11988 and/or 11990, in accordance with HUD regulations at 24 CFR 55.20 Subpart C Procedures for Making Determinations on Floodplain Management, to determine the potential affect that its activity in the floodplain and wetland will have on the human environment for Town of Busti Water District Improvements Project. The proposed project will include various upgrades to the Town of Busti s existing water district. Improvements may involve water main installation, water source and treatment improvements, locating and developing an additional water source, water meter replacement, controls/monitoring system upgrades, and various other water system improvements. Water main is anticipated to be installed within mapped 100-year floodplains located along Lawson Road and Busti-Sugar Grove Road. The installation of this water main is anticipated to result in the temporary disturbance of 0.5 acres of floodplains, which will all be restored to pre-construction conditions following installation of the water main. The project is not anticipated to have any permanent impacts to floodplains. The proposed project will take place at the site of a new water storage tank on Orr Street and along various roads including Mill Road, Lawson Road, and Busti-Sugar Grove Road within the Town of Busti, Chautauqua County. Town of Busti has considered the following alternatives and mitigation measures to be taken to minimize adverse impacts and to restore and preserve natural and beneficial values: existing water main already intersects the floodplain, there is no alternate route for water main installation, and all areas with water main will have temporary disturbance and restored to pre-construction conditions after project completion. The project will be constructed in compliance with state and local floodplain protection procedures and regulations. Town of Busti has reevaluated the alternatives to building in the floodplain and has determined that it has no practicable alternative. Environmental files that document compliance with steps 3 through 6 of Executive Order 11988 and/or 11990, are available for public inspection, review and copying upon request at the times and location delineated in the last paragraph of this notice for receipt of comments. This activity will have no significant impact on the environment for the following reasons: the area will be temporarily disturbed during construction and returned to pre-construction conditions after the project. There will be no permanent impact to floodplains as a result of this project. There are three primary purposes for this notice. First, people who may be affected by activities in floodplains and those who have an interest in the protection of the natural environment should be given an opportunity to express their concerns and provide information about these areas. Second, an adequate public notice program can be an important public educational tool. The dissemination of information about floodplains can facilitate and enhance Federal efforts to reduce the risks associated with the occupancy and modification of these special areas. Third, as a matter of fairness, when the Federal government determines it will participate in actions taking place in floodplains, it must inform those who may be put at greater or continued risk. Question Deadline 07/31/2026 Written comments must be received by the Town of Busti at the following address(8 days after this publication): Town of Busti, 125 Chautauqua Avenue, Lakewood, NY 14750 and 716-763-8561, Attention: Jesse Robbins, Supervisor, during normal business hours.
Final Planning
$2,500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 26, 2026
Multiple Locations, Busti, NY
Related To This Project
Mineola, NY
Bid Date: Aug 24 2026
Bronx, NY
Bid Date: Aug 04 2026
Caledonia, NY
Bid Date: Aug 20 2026
Schenectady, NY
Bid Date: Sep 29 2026
New York, NY
Bid Date: Jul 28 2026
Piffard, NY
Bid Date: Aug 06 2026
Buffalo, NY
Bid Date: Aug 10 2026
Buffalo, NY
Bid Date: Aug 17 2026
Schenectady, NY
Bid Date: Aug 06 2026
Peekskill, NY
Bid Date: Sep 09 2026
Hauppauge, NY
Bid Date: Aug 07 2026
New York, NY
Bid Date: Jul 30 2026
Albion, NY
Bid Date: Dec 31 2026
Goshen, NY
Bid Date: Aug 25 2026
Calverton, NY
Bid Date: Aug 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
