BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 23, 2026

Site work for a water / sewer project in North Logan, Utah. Completed plans call for site work for a water / sewer project.

This project will construct two new pressurized waterlines within North Logan. The first waterline alignment will originate near 2350 East and roughly follow the corridor of the proposed Bonneville Shoreline Trail. The second alignment will commence at 3025 North and extend northward, routing adjacent to an existing Rocky Mountain Power corridor, connecting to the existing water system at Cliffrose Way. To accommodate the steep terrain along these routes, the project will utilize high-density polyethylene (HDPE) fused pipe. The scope of work also includes necessary tie-ins to the existing municipal water network and the installation of a new pressure-reducing valve (PRV) vault and appurtenances.

Bid Results

$657,850.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
36
Bidding Soon
704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

August 31, 2026

Project location map

Multiple Locations, North Logan, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.