Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 17, 2026 at 8:00 PM
Updated August 23, 2026
Site work and renovation of a multi-residential development in Baltimore, Maryland. Completed plans call for the renovation of a multi-residential development.
Renovation of one vacant residential unit, including all labor, materials, supervision, equipment, and required permits to complete requested work items. Question Deadline 08/03/2026 at 2:00 PM ET Online Portal . The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations 1000 Stoddard General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Supply and Install roll shades in all windows 3. Remove all existing appliances and range hood 4. Supply and Install closet shelving/closet rod 5. Final Cleaning of Entire Unit (Including All window sill & wells) to Make Ready for Occupancy. Bathrooms: 1. Supply and Install Fan and cover in bathroom 2. Supply and Install Vanity Cabinet w/ Vanity Bowl and faucet 3. Supply and install new 16-inch elongated toilets and seats 4. Supply and Install New Medicine Cabinet with Mirror 5. Supply and Install New 5-piece bathroom Accessories 6. Clean and resurface Bathtub 7. Supply and Install New Ceramic tile 12 x 12 Stone Gray Color 8. Supply and Install Delta Tub Faucet and drain cover plate with stopper 9. Supply and Install trap(metal) and supply lines under bathroom sink 10. Supply and Install Shower Rods and hardware Kitchen: 1. Clean Kitchen Cabinets with HUD Severe Use base and wall cabinets 2. Clean Countertop Postformed Wilsonart Black Granite Laminate countertops 3. Supply and Install Broan #4100 range hood 4. Supply and Install Black backsplash behind stove and side wall 5. Clean single bowl stainless steel kitchen sink and faucet 6. Supply and Install (metal) traps and supply lines under kitchen sink 7. Clean and paint Washing Machine Hookup Mechanical /Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair Drain, Water & Vent (Bathroom and Kitchen, toilets) run snake through sink in kitchen and Bathroom drainpipes Electrical: 1. Supply and Install all Switches / Receptacles outlets, GFI's , A/C outlet and metal cover plates. (White) 2. Supply and Install Electric Service Panel for Gaps/Missing Breakers/Doors.3. Supply and Install all light fixtures with LED integrated light fixtures, if missing or inoperable 4. Supply and Install all vents and covers throughout unit 5. Supply and install 10 YR lithium Smoke Detector in bedroom and Carbon/Smoke in hallways and living rooms Doors & Windows: 1. Supply and Install all interior door hinge and door knobs hardware including door stops(Do Not Paint Door Hinges) 2. Supply and Install all new hinges, weatherstripping, door knockers, peep holes and door sweeps on exterior doors (Do Not Paint Hinges) 3. Paint Canopy overtop of outside exterior door and all Canopies within 20 ft. Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o o o Walls and ceilings shall be painted with two finish coats eggshell latex. Kitchen and bathroom walls & ceilings, and all doors, wood windows and wood trim shall receive a semigloss final finish coat. Paint All radiators Front and Back. Bath and Kitchen (Semi-Gloss), Bedrooms and all other areas (Flat) The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. Scrape and Paint All outside Canopy (Terracotta Red) and all outside handrails (Black)and drain pipe (Black) 20 ft out left and right of unit Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Supply and install 6" baseboards and 3/4 Round shoe molding and caulk throughout unit.
Post-Bid
$80,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2026
September 7, 2026
1000 Stoddard Ct, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Aug 17 2026
Baltimore, MD
Bid Date: Aug 19 2026
Baltimore, MD
Bid Date: Oct 02 2026
Baltimore, MD
Bid Date: Aug 05 2026
Baltimore, MD
Bid Date: Aug 10 2026
Baltimore, MD
Bid Date: Aug 14 2026
Baltimore, MD
--
Baltimore, MD
Bid Date: Aug 27 2026
Baltimore, MD
Bid Date: Aug 07 2026
Baltimore, MD
Bid Date: Aug 03 2026
Baltimore, MD
Bid Date: Sep 03 2026
Baltimore, MD
Bid Date: Sep 18 2026
Baltimore, MD
Bid Date: Jul 30 2026
Baltimore, MD
Bid Date: Aug 27 2026
Baltimore, MD
Bid Date: Sep 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
