Published August 12, 2026 at 8:00 PM

Updated August 18, 2026

Site work and new construction of an educational facility in Blacksburg, South Carolina. Completed plans call for the construction of a educational facility.

As of August 11, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. Construction of a band storage building onstruction of one (1) 20' x 40' metal storage building at Blacksburg High School, 201 W. Ramseur Street, Blacksburg, SC 29702, with the following minimum specifications: Vertical metal siding and metal roof Concrete slab/floor Two (2) garage doors ( 10' high x 8' wide) Include an allowance of $5,000 for the garage doors within the quote pricing Two (2) man doors Two (2) windows Electrical to include - Four (4) interior lights -Six (6) exterior wall pack lights - Six (6) receptacles The required completion date for this project is January 1 , 2027. The work shall include required site preparation, excavation, grading, foundation and concrete work, utility connections, electrical distribution, trenching, backfill, testing, cleanup, and restoration of areas disturbed by construction. The building, foundation, slab, anchorage, structural components, and electrical work shall be designed and installed in accordance with applicable building codes, accessibility requirements, manufacturer requirements, and required wind, seismic, and other design loads. The contractor shall provide engineered or sealed drawings when required by the permitting authority. The contractor shall obtain and pay for all permits, licenses, plan reviews, inspections, and approvals required for the work. The contractor shall coordinate inspections and provide evidence of final approval before requesting final payment. Metal panels, roofing, trim, doors, windows, hardware, lighting, receptacles, switches, conduit, panels, conductors, and related components shall be new, commercial-grade materials suitable for the intended use. Final colors and finishes shall be selected or approved by the District before ordering. The contractor shall protect existing facilities and operations, remove construction debris, repair damage caused by the work, and leave the site clean and ready for use. At closeout, provide applicable warranties, product information, approvals, and asbuilt information. Questions must be submitted in writing to the Lindsey Bocachica at lindsey.bocachica@cherokeel.org no later than July 30, 2026 at 12:00 p.m. EDT

Post-Bid

$600,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
133
Bidding Soon
1,821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2026

December 25, 2026

Project location map

201 W Ramseur Dr, Blacksburg, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.