Published August 20, 2026 at 8:00 PM

Updated August 26, 2026

Site work and new construction of a water / sewer project in Bentonville, Arkansas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of gravity sewer mains (18-inch to 30-inch diameter) including PVC and ductile iron pipe, steel encasement via pilot guided auger bore, and associated roadway and surface restoration. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Question Deadline 08/21/2026 at 4:00 PM CT Questions must be submitted via written communication only to purchasing@bentonvillear.com All questions must be submitted to zmhoyt@garverusa.com The Work is divided into multiple Alignments and Work Zones that are intended to be constructed in a phased manner. Unless otherwise approved by the Owner, Contractor shall commence Work in Alignment 3 - Zone 1 and progress to Alignment 3 - Zone 2, Alignment 2, and Alignment 4 in accordance with the anticipated sequencing established by the Contract Documents. - Alignment 3 is divided into 2 separate Work Zones and includes installation of approximately 1,678 linear feet of gravity sewer, consisting primarily of 24-inch diameter PVC sewer main and approximately 153 linear feet of 36-inch steel encasement installed via auger bore. This area has very specific site access and storage constraints. Alignment 2 includes installation of approximately 1,817 linear feet of primarily 30-inch diameter gravity sewer, consisting of approximately 1405 linear feet of PVC sewer main and 412 linear feet of ductile iron pipe, with associated roadway restoration and surface restoration Alignment 4 includes installation of approximately 1,883 linear feet of gravity sewer, consisting primarily of 18- inch diameter PVC sewer main , with upsizing of the existing sewer and associated roadway and surface restoration. Building & Earth Project No.: BV250107-Change Order 2

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
65
Bidding Soon
856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

November 2, 2026

Project location map

Multiple Locations, Bentonville, AR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.