BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2026 at 8:00 PM

Updated August 13, 2026

Site work and renovation of a bridge / tunnel in Independence, Kentucky. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

Bridge replacement for the Kenton County Parks and Recreation. Question Submission Deadline:August 12, 2026, 10:00am SCOPE OF WORK The contractor shall schedule a Pre-Construction Conference with the County and the Engineer as soon as practical after the award and receipt of the finalized contract documents for the project. The contractor shall provide a written narrative schedule at least two days prior to the Pre-Construction Conference in accordance with Standard Specifications Section 108.02 detailing but not limited to, specifying the designer and fabricator of the pre-fab bridge truss and the timeframes for design, breaking ground and completion of the project. Work shall be performed in a manner that minimizes impact to the park and walking trails, as much as possible. After the contractor has selected a bridge fabricator/designer and obtained a delivery commitment date letter, the contractor shall notify the Engineer in writing of the date they intend to mobilize and close path access across the existing bridge. The contractor may begin work once this date has been submitted and approved. Then, the contractor shall have 120 days from actual mobilization and closure of the path to complete the project. The contractor shall also meet the November 1 , 2027, calendar date of completion. The bridge shall not be re-opened to the public until a substantial completion inspection, and all public safety items have been completed

GC Bidding

$750,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
123
Bidding Soon
2,412
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2026

September 16, 2026

Project location map

420 Independence Station Rd, Independence, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.