BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2026 at 8:00 PM

Updated August 23, 2026

Site work and paving for a sidewalk / parking lot in Salt Lake City, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Remove existing concrete curb and gutter, pedestrian ramps, and sidewalk and install concrete curb and gutter, and pedestrian ramps. Contractor will remove existing concrete curb and gutter, pedestrian ramps, and sidewalk at the intersections of Hillside Avenue/State Street, 200 North/State Street, and North Temple/State Street; install concrete curb and gutter, pedestrian ramps (9), and concrete sidewalk; and remove the central island concrete at 300 North/State Street and install concrete curb along the back of the apron . See Table 1 for site locations and general scope. Removed asphalt and concrete will be the property of the contractor and hauled away by the contractor. The contractor is responsible for any damage to items that are to be protected in-place. Contractor must meet all UDOT 2026 Standards, Specifications, and Drawings. NB & SB I-80 @ MP 191.5 & 195 Bonds: Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 08/11/2026 at 2:00 PM MT Deadline to submit Questions

Award

$455,778.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
64
Bidding Soon
1,173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

September 11, 2026

Project location map

UT-186, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.