Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 12, 2026 at 8:00 PM
Updated August 18, 2026
Site work and new construction of a playground / park / athletic field in Gunlock, Utah. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
Construction of a new entrance station for Gunlock State Park. The purpose of this IFB is to enter into a contract to provide construction of the entrance station to Gunlock State Park. It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor. Length of Contract: Substantial Completion Date: January 1, 2027. Vendor must guarantee its pricing through completion of the project. ** Site visit info : The meeting will begin promptly at the specified time. Any prospective bidders who arrive late at the meeting will not be allowed to continue with the site visit nor submit a bid. Failure to attend the site visit shall result in the disqualification of any bidder who does not have an authorized representative attend the entire duration of the mandatory site visit. This includes not taking calls/texts during the site visit. Phones may be used to take pictures. All discussions not related to the site visit must be done after the site visit to avoid disturbing attendees. An attendance log will be maintained including the name of each attendee, the entity the Question Deadline 08/11/2026 at 2:00 PM MT Galloway Project No.: UDF000029 The Project consists of the construction of New Entrance Station to house offices, fee station, information desk and retail .. The Contractor's bid shall include furnishing all supervision, labor, materials, tools, equipment, transportation, and incidentals necessary for the complete construction of the Gunlock State Park Entrance Station and all associated site work. All work must be completed in strict accordance with the stamped Construction Documents, Project Manual , Structural Calculations, and DFCM General Conditions. Major Construction Work & Trades Include: Civil, Site Work & Utilities: Site clearing, grubbing, tree/brush removal , demolition, and asphalt saw cutting. Earthwork, site excavation (~ 1,012 CU YD), and placement of structural fill/embankment (~517 CU YD) per the Geotechnical Report. Installation of ~20,325 SQ FT of 3-inch Hot Mix Asphalt (HMA PG 58-28) paving, 4-inch concrete flatwork, 6-inch reinforced concrete flatwork, concrete curb walls, steps, parking blocks, bollards, and concrete retaining walls with footers. - Utility trenching and service connections: ~95 LF of 1 -inch Poly water line, ~95 LF of 4-inch D-3034 PVC sewer pipe with double cleanouts, and main electrical service tie-in . - Application of pavement marking paint (traffic arrows, ADA stall symbols) and installation of standard steel-post roadside signage (Stop, One Way, Do Not Enter, Van Accessible). Structural & Building Envelope: Interiors: Cast-in-place concrete slab-on-grade foundation with continuous perimeter footings and thickened slab footings. 2x6 wood stud wall framing, structural composite lumber, structural steel HSS columns/beams, and prefabricated metal plate wood roof trusses. Exterior envelope: Standing seam metal roof system, continuous rigid board thermal insulation, weather/vapor barriers, thermally broken aluminum storefronts, sliding transaction glass doors, adhered manufactured stone masonry veneer, and an Exterior Insulation and Finish System (EIFS). Complete interior finish build-out incorporating office space, fee counter/desk, public retail space, storage, utility rooms, and an ADA-compliant single-user restroom . Interior wall/ceiling finishes: Gypsum board assemblies, fiberglass reinforced paneling (FRP) in wet areas, suspended acoustical ceilings, painting, ceramic tiling, LVT, tile carpeting , custom architectural wood casework, and restroom accessories. 2 Mechanical, Electrical & Plumbing (MEP): HVAC: Installation of a 2-zone single package vertical unit heat pump system (22 kBtu/h heating, 23 kBtu/h cooling), complete ductwork, exhaust fans, and programmable controls per 2021 IECC. Plumbing: Point-of-use 6-gallon electric water heater, domestic water piping, sanitary waste/vent piping, backflow preventers, floor drains , and commercial ADA plumbing fixtures. Electrical: Main electrical service panel distribution, telecommunications raceways, satellite mount infrastructure, and interior/exterior LED lighting fixtures with daylight and occupancy sensors. Work Excluded (Work by Owner / NIC): O Movable office furniture, loose retail display fixtures, and soft furnishings. Final park landscape planting. Project Location: Gunlock State Park, 1450 Gunlock Road, Gunlock, UT 84733.
GC Bidding
$750,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2026
September 24, 2026
1450 Gunlock Rd, Gunlock, UT
Related To This Project
Gunlock, UT
Bid Date: Sep 01 2026
Gunlock, UT
Bid Date: Aug 20 2026
Gunlock, UT
Bid Date: Mar 17 2026
Gunlock, UT
Bid Date: Feb 03 2025
Gunlock, UT
Bid Date: Mar 27 2022
Gunlock, UT
Bid Date: Sep 28 2021
Salt Lake City, UT
--
Ephraim, UT
Bid Date: Aug 18 2026
West Valley City, UT
--
Salt Lake City, UT
Bid Date: Aug 20 2026
Spanish Fork, UT
Bid Date: Aug 11 2026
Orem, UT
Bid Date: Aug 19 2026
Duchesne, UT
Bid Date: Aug 12 2026
Sandy, UT
Bid Date: Aug 10 2026
Farr West, UT
Bid Date: Aug 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
