Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 31, 2026 at 8:00 PM
Updated August 4, 2026
Site work for a water / sewer project in Crofton, Nebraska. Completed plans call for site work for a water / sewer project.
Design and installation of a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping at the Gavins Point Project. Work includes providing all labor, equipment, and materials necessary to install a new zebra mussel mitigation system. Significant features include installation of two local tank skids with integral spill containment pallets, installation of two pump skids for chemical distribution, power supply connections for distribution pumps and ancillary distribution equipment, and integration of the distribution pumps with existing raw water flow meters. The contractor shall commence work upon contract award and complete the project within 210 calendar days after receipt of the Notice to Proceed. The estimated construction cost is between $250,000 and $500,000. Location: Gavins Point Project, 88401 Highway 121, Crofton, NE 68730. Question Deadline 08/21/2026 All Bidder Inquiries must be submitted no later than ten (10) calendar days before the proposal due date, Contract Specialist - Primary POC: Brianna Wohlers Brianna.N.Wohlers@usace.army.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
$500,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2026
September 30, 2026
Gavins Point Dam, Crofton, NE
Related To This Project
Crofton, NE
--
Crofton, NE
Bid Date: Aug 24 2026
Crofton, NE
Bid Date: Aug 06 2026
Crofton, NE
--
Crofton, NE
Bid Date: Jul 28 2026
Crofton, NE
Bid Date: May 07 2026
Crofton, NE
Bid Date: Apr 10 2026
Crofton, NE
Bid Date: Mar 24 2026
Crofton, NE
Bid Date: Mar 25 2026
Crofton, NE
Bid Date: Mar 16 2026
Crofton, NE
Bid Date: Nov 17 2025
Crofton, NE
Bid Date: Feb 10 2026
Crofton, NE
Bid Date: Sep 09 2025
Crofton, NE
Bid Date: Sep 03 2025
Crofton, NE
Bid Date: Jul 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
