Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 15, 2026 at 8:00 PM

Updated October 21, 2026

Site work for a water / sewer project in Marshfield, Massachusetts. Completed plans call for site work for a water / sewer project.

WWTP Air Conditioner Replacement The work generally consists of furnishing all labor, materials, equipment, crane services, supervision, transportation, and incidentals necessary to remove the existing rooftop air conditioning unit and furnish and install one (1) new rooftop air conditioning unit, including startup, testing, commissioning, and disposal of the existing equipment. The basis of design isas follows: Rooftop Unit: Model RACDYB120ADG000AAAB0, or approved equal Please note that any approved equal must not exceed the total weight of the existing unit or unit proposed, as the roof will not be structurally evaluated to ensure it can handle any additional loads from larger/heavier units. o 454B Refrigerant Ready Commercial Packaged Air Conditioner . 460 Volt, 3 Phase, 60 Hz o Factory Options: Core Command(TM) (Non-Communicating) and Low Ambient/Freeze Stat Economizer: MicroMetl Model RXRD-11MDHAM3 (Horizontal, Non -DDC with Siemens Controls), or approved equal Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Award is subject to final approval.

Award

$33,100.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
288
Bidding Soon
4,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2026

September 14, 2026

Project location map

200 Joseph Driebeek Way, Marshfield, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed