Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 14, 2026 at 8:00 PM
Updated August 20, 2026
Demolition, site work and addition to a water / sewer project in Page, Arizona. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
PAGE UTILITY ENTERPRISES is requesting Statements of Qualifications (SOQs) for the construction assurance services to support the Water Treatment Plant Expansion Project. Question Deadline 08/19/2026 at 4:00 PM MT AGENCY RESPONSE TO QUESTIONS: AUGUST 26, 2026 Page Utility Enterprises is responsible for providing water and sewer services to the City of Page, Arizona, a former Bureau Government Camp. The City's sole source of water is 2,740 acre-feet per year (AFY) of federally allocated water from Lake Powell. The City of Page's surface water treatment plant (WTP) specifically supplies the City of Page and the Navajo Tribal Village of LeChee. The WTP has been in service for over 60 years and is nearing the end of its useful life . The WTP is currently rated for 3.3 million gallons per day (MGD), however, during peak tourism season in the summer, the City often needs to operate the plant at higher flows to meet demands. Running the plant at a higher rate than it is designed for jeopardizes the quality and safety of the drinking water and could lead to regulatory violations. The City relies on the income from the more than 2 million tourists that visit the area each year and needs to ensure that its water infrastructure can reliably meet that level of demand. An evaluation of the plant was conducted to determine the improvements necessary to increase the WTP's capacity to 6.6 MGD . These improvements consist of an increased clear well pumping capacity, increased high service pumping capacity, and increased ultraviolet disinfection capacity. Associated with the plant improvements is an issue with the City's raw water intake structure and conveyance pipeline in Glen Canyon Dam, which were constructed in the 1950s and have served well past their useful life. Critical improvements related to these aspects are intended to be addressed under a separate project.
GC Bidding
$7,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2026
January 11, 2027
814 Aqua Ave, Page, AZ
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
