BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2026 at 8:00 PM

Updated August 6, 2026

Renovation of an elderly care / assisted living facility in Hinckley, Minnesota. Completed plans call for the renovation of a elderly care / assisted living facility.

Removal and replacement of flooring in general and public spaces, including demolition of old carpeting, base coverings, and trim; concrete subfloor preparation; and installation of commercial-grade Luxury Vinyl Tile (LVT) with transition strips and cove or rubber base. ny material that cannot be reused or matched must be replaced . Removal includes removing old carpeting and any remainders of binding material that is present and could/would interfere with the new flooring installation. Any materials, base coverings , trim, or other items removed during demolition that cannot be matched to the current building standard must be replaced. The Contractor shall furnish all labor, materials, equipment, supervision , transportation, and disposal necessary to complete the following: Demolition: 2. Remove all existing flooring throughout designated project areas. 3. Remove existing vinyl and wood base and trim materials as required to completely demo and install new flooring. 4. Remove adhesives as necessary. 5. Dispose of all materials off- site in accordance with applicable regulations . Floor Preparation: 6. Inspect existing concrete subfloor, repair minor cracks and imperfections . Grind high spots . Patch and/or fill and level low areas as required. 7. Prepare substrate in accordance with flooring manufacturer specifications. 8. Install commercial-grade Luxury Vinyl Tile ( LVT ) including: 9. Flooring must meet the minimal requirements as listed: 10. Commercial wear layer (minimum 20 mil recommended) 11. Slip- resistant finish 12. Healthcare- grade finish 13. Moisture- resistant construction 14. Aesthetics Color and pattern selected by HHS Facilities Senior Living Manager and Senior Living Resident (s ) 15. Matching transition strips 16. Cove or rubber base throughout 17. New Flooring Installation 18. Install commercial- grade Luxury Vinyl Tile ( LVT) including: 19. Highlighted Spaces on the Floor Plan including but not limited to corridors, common areas , dining areas, activity rooms , offices, and other defined spaces. Interested bidders shall contact Curt Kalk Jr. , HHS Facilities Director, at 320.362.1657 or at kurt.kalkjr@hhs.millelacsband-nsn.gov

Sub-Bidding

$450,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
101
Bidding Soon
1,359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

September 18, 2026

Project location map

38786 Hinckley Rd, Hinckley, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.