BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2026 at 8:00 PM

Updated August 5, 2026

Site work, paving, outdoor lighting and renovation of a road / highway in West Milwaukee, Wisconsin. Completed plans call for the renovation of a road / highway; and for outdoor lighting for a road / highway.

The Base Bid (S. 49th Street) work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Pavement Sawing - 45 LF, Milling Pavement (3 Inches) - 2,802 SY, 7 Inch Concrete Base Repair - 561 SY, Driveway Pavement Removal - 730 SF, Concrete Curb & Gutter Removal - 529 LF, Dense Graded Base (3/4") 299 TON, 31" Concrete Curb & Gutter - 529 LF, 7" Concrete Driveway - 82 SY, Bit. Concrete Surface (4 LT 58-28 S) - 509 TON, Manhole Adjustment - 8 EA, Storm Inlet Adjustment - 3 EA, Storm Inlet Rehabilitation - 1 EA, Valve Adjustment - 2 EA, 10" Dia PVC Sanitary Sewer Spot Repair (5 LF) w/ Lateral - 1 EA, 10" Dia PVC Storm Sewer Spot Repair (5 LF) - 1 EA, 10" Dia Storm CIPP Sectional Liner (4 LF) - 1 EA, 12" Dia Storm CIPP Sectional Liner (4 LF) - 2 EA, Remove Lighting Unit & Luminaire - 9 EA, Remove Existing Wiring - 6,012 LF, Street Lighting Unit, Type 1 - 9 EA, Electrical Wire, Lighting, No. 6 - 6,012 LF, Speed Hump - 2 EA, Pavement Marking, Epoxy, White, Speed Hump Symbol - 8 EA, Pavement Marking, Epoxy, White, 12-inch - 144 LF, Signs, Type II, Reflective H-67 SF, Posts, and Tubular Steel, 2"x2"x16' - 8 EA The Alternate A (48th/49th Street Alley) work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Milling Pavement (2 Inches) - 1,836 SY, 7 Inch Concrete Base Repair- 386 SY, Dense Graded Base (3/4") - 123 TON, Bit. Concrete Surface (4 LT 58-28 S) - 223 TON, and Storm Inlet Adjustment - 3 EA The Alternate B (45th Street Alley) work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Milling Pavement (2 Inches) - 1,174 SY, 7 Inch Concrete Base Repair-235 SY, Dense Graded Base (3/4") - 79 TON, and Bit. Concrete Surface (4 LT 58-28 S) - 143 TON The Alternate C (Miller Park Way) work generally consists of the following: Restoration-1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Pavement Sawing - 285 LF, Pavement Removal - 1,468 SF, Concrete Curb & Gutter Removal - 13 LF, Dense Graded Base (1.25") - 55 TON, 9" Concrete Pavement (HES) - 164 SY, 31" Concrete Curb & Gutter 13 LF, Manhole Adjustment - 2 EA, Storm Inlet Adjustment - 1 EA, Pavement Marking, Epoxy, White, 8-inch - 26 LF, Pavement Marking, Epoxy, White, 6-inch - 92 LF Questions about this project Please contact: Ben High, P.E. Village Engineer - West Milwaukee at phone: 262-317-3273 Ben.High@rasmith.Com

GC Bidding

$450,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
166
Bidding Soon
2,957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

September 4, 2026

Project location map

Multiple Locations, West Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.