Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 31, 2026 at 8:00 PM
Updated August 5, 2026
Site work for a mixed-use development in Big Timber, Montana. Completed plans call for site work for a water / sewer project; and playground / park / athletic field.
The Greycliff Rest Area Rehab project consists of the design and implementation of potable water and wastewater system improvements for the MDT Greycliff Eastbound and Westbound Rest Area facilities on each side of I-90 near RP 381.0. The project will address capacity, reliability, water quality, and regulatory compliance. Work includes reconfiguring the public water system to serve both facilities from a newly constructed and DEQ-approved public water supply well at the Westbound Rest Area; abandoning the existing Eastbound well; installing a new 5,000-gallon buried potable water storage tank; providing new water service piping between buildings; and installing redundant distribution pumps, controls, valves, and appurtenances necessary to meet projected maximum day and peak instantaneous demands in accordance with DEQ Circular DEQ-3. The project also includes replacement of the existing undersized on-site wastewater system with a new advanced Level 2 treatment system, including new septic tanks, an equalization tank, a dosing tank, effluent pumps, force mains, and a multi-zone pressure-dosed drainfield. This project is located in Sweetgrass County. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10095000 MT DOT - 205 - Greycliff Rest Area Rehabiltation
GC Bidding
$5,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2026
October 26, 2026
Multiple Locations, Big Timber, MT
Related To This Project
Big Timber, MT
Bid Date: Jul 13 2026
Big Timber, MT
--
Big Timber, MT
Bid Date: Apr 01 2026
Big Timber, MT
Bid Date: Apr 02 2026
Big Timber, MT
Bid Date: Mar 03 2026
Big Timber, MT
Bid Date: Dec 10 2025
Big Timber, MT
Bid Date: Sep 25 2025
Big Timber, MT
Bid Date: Oct 23 2025
Big Timber, MT
Bid Date: Jun 25 2025
Big Timber, MT
Bid Date: Jun 17 2025
Big Timber, MT
Bid Date: Apr 22 2025
Big Timber, MT
Bid Date: Apr 15 2025
Big Timber, MT
Bid Date: Oct 07 2024
Big Timber, MT
Bid Date: Sep 12 2024
Big Timber, MT
Bid Date: Sep 12 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
