Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 31, 2026 at 8:00 PM
Updated August 3, 2026
Demolition, site work, paving and new construction of a mixed-use development in Schaumburg, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants that the Prime Consultant will be using are scheduled to attend an initial meeting on October 21, 2026, at 1:00 PM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for work related to contract plan preparation for road and bridge improvements, development of specifications and estimates, plan review, and surveying on various projects in District One. Work Orders under this agreement may include preparation of contract plans for roadway and bridge repairs and improvements, drainage improvement plans, preparation of miscellaneous roadway plans, structure details, lighting plans, traffic signal plans, ADA ramp details, review of plans by Consultant and local agency consultants for roadway and rehabilitation projects, obtaining pavement composition cores for resurfacing projects and geotechnical borings for structure design, and providing supplemental roadway and bridge deck surveying for various projects. The primary focus of the scope of work order will be the contract plan preparation for pavement preservation related projects. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) The method of contractor selection has not been determined at this time. ILDOT - 23 - RFQ Engineering - Various Phase II Pavement Preservation Projects
Conceptual
$2,500,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2027
Multiple Locations, Schaumburg, IL
Related To This Project
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
Bid Date: Aug 12 2026
Schaumburg, IL
--
Schaumburg, IL
Bid Date: Jul 31 2026
Schaumburg, IL
Bid Date: Jul 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
