Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 19, 2026

Site work and environmental remediation for a development in Tacoma, Washington. Completed plans call for environmental remediation for a development; and for site work for a development.

Estimated cost range is $ 1,225,000 to $ 1,425,000 The Work required for this Project includes Bid Estimate 1. The dredging of the Fife ditch from an area south of 4th Street to an area north of Taylor Way to remove sediment and vegetation from the ditch. 2. The excavation of +/- 12 of material in an area of invasive plant species mainly comprised of R Canary Grass and Yellow Flag Iris. 3. The excavation of +/- 6 of material in the area of debris laden soil . This area will contain general refuse, batteries, clothes, tools, sporadic drug paraphernalia, building materials and other debris left over from a former homeless encampment clean up. 4. All material from 1 thru 3 above will be combined on site and taken to LRI's facility located at 304th and Meridian for disposal. The Port will pay LRI directly for all associated tipping fees and applicable tax. 5. The excavation of +/- 24 of material at a pocket of slag like material. This material shall be removed prior to any other ground disturbing activity within 10' of the anticipated boundary of the material . This material will be direct loaded into trucks and taken to LRI for disposal. Dredging of the Fife ditch, excavation and removal of invasive plant species and debris-laden soil from a former encampment, removal of slag material, tree removal and disposal, and site restoration including planting and side slope restoration. Bonds: 5% Bid Bond. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Due: Wed, 08/12/2026 - 02:00PM

Award

$884,810.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
105
Bidding Soon
1,746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

October 3, 2026

Project location map

Multiple Locations, Tacoma, WA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed