Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 6, 2026 at 8:00 PM
Updated August 9, 2026
Site work and environmental remediation for a development in Tacoma, Washington. Completed plans call for environmental remediation for a development; and for site work for a development.
Estimated cost range is $ 1,225,000 to $ 1,425,000 The Work required for this Project includes Bid Estimate 1. The dredging of the Fife ditch from an area south of 4th Street to an area north of Taylor Way to remove sediment and vegetation from the ditch. 2. The excavation of +/- 12 of material in an area of invasive plant species mainly comprised of R Canary Grass and Yellow Flag Iris. 3. The excavation of +/- 6 of material in the area of debris laden soil . This area will contain general refuse, batteries, clothes, tools, sporadic drug paraphernalia, building materials and other debris left over from a former homeless encampment clean up. 4. All material from 1 thru 3 above will be combined on site and taken to LRI's facility located at 304th and Meridian for disposal. The Port will pay LRI directly for all associated tipping fees and applicable tax. 5. The excavation of +/- 24 of material at a pocket of slag like material. This material shall be removed prior to any other ground disturbing activity within 10' of the anticipated boundary of the material . This material will be direct loaded into trucks and taken to LRI for disposal. Dredging of the Fife ditch, excavation and removal of invasive plant species and debris-laden soil from a former encampment, removal of slag material, tree removal and disposal, and site restoration including planting and side slope restoration. Bonds: 5% Bid Bond. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Due: Wed, 08/12/2026 - 02:00PM
GC Bidding
$1,425,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2026
October 3, 2026
Multiple Locations, Tacoma, WA
Related To This Project
Tacoma, WA
Bid Date: Sep 10 2026
Tacoma, WA
Bid Date: Sep 08 2026
Tacoma, WA
Bid Date: Aug 13 2026
Tacoma, WA
--
Tacoma, WA
Bid Date: Sep 01 2026
Tacoma, WA
Bid Date: Aug 24 2026
Tacoma, WA
Bid Date: Aug 21 2026
Tacoma, WA
Bid Date: Aug 25 2026
Tacoma, WA
Bid Date: Aug 28 2026
Tacoma, WA
Bid Date: Aug 12 2026
Tacoma, WA
Bid Date: Jul 24 2026
Tacoma, WA
Bid Date: Aug 18 2026
Tacoma, WA
Bid Date: Jul 31 2026
Tacoma, WA
Bid Date: Aug 06 2026
Tacoma, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
