BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2026 at 8:00 PM

Updated August 29, 2026

Demolition, site work, paving, outdoor lighting, new construction and renovation of a mixed-use development in Oxnard, California. Completed plans call for the expansion of a road / highway, sidewalk / parking lot and transportation facility.

The 2018 edition of the Standard Specifications for Public Works Construction and all amendments to the Standard Specification for Public Works Construction 2021 Edition (collectively the "Greenbook") is incorporated by this reference. As more specifically described in the Contract Documents, the Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to construct new concrete sidewalk, curb and gutter, road reconstruction , driveway reconstruction , electrical conduit and pull boxes for street lighting, traffic signals, bus shelters and street furniture, bike lanes, landscaping and irrigation system along 4th Street from C Street to Oxnard Boulevard with striping improvements continuing on 4th Street and Meta Street to the intersection of Meta Street and 6th Street. Additionally, approximately 50 bus stops will be improved throughout the downtown area. The Work includes the removal of existing curb, gutter, sidewalk and pavement, replacement and modification of traffic signals, removal and replacement of street lighting, removal and replacement of street trees and tree well grates; placement and compaction of asphalt concrete pavement; excavation and reconstruction of a portion of 4th Street; concrete works; adjust utility covers to finished grade; installation of storm drain lines and appurtenant concrete structures; and traffic striping. Construct new concrete sidewalk, curb and gutter, road reconstruction, driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters and street furniture, bike lanes, landscaping, and irrigation. Project also includes removal of existing infrastructure, pavement replacement, traffic signal modifications, utility cover adjustments, storm drain installation, and traffic striping. Bonds: 10% Bid Bond, 100% Payment Bond, 100% Performance Bond.

GC Bidding

$4,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
147
Bidding Soon
2,624
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2026

November 9, 2026

Project location map

Multiple Locations, Oxnard, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.