Published August 10, 2026 at 8:00 PM
Updated August 12, 2026
Site work and environmental remediation for a development in Hazard, Kentucky. Completed plans call for environmental remediation for a development.
Reclamation consists of the removal of approximately 7.5 acres of slide/transition (Slide A) material to rock and the installation of ditches to control drainage. Slide B is included to excavated to rock, to provide for a stable access on the Hazard 7 Level. An Earthwork Bid Item is setup to excavate and transport slide materials to the waste area, via the Hazard 7 bench and Upper Second Creek Road. Material will be placed, graded and compacted at the waste area. Reclamation work at the Slide & Transition area will include the installation of Concrete ditch work (Concrete Form & Finished) to properly handle surface runoff. Reinforcing steel is included for proper concrete ditch construction. Installation of 15" 18", 24" & 36" HDPE pipes & Concrete Headwalls are included to handle surface runoff from the site. A Hoe Ram bid item is included to break boulders and construct rock excavated ditches. Class II Backfill is included to properly backfill Wall & ditches to enhance slope stability above these features. Concrete Gravity Wall are included to ensure the Bryant Residence is not undercut by the proposed surface drainage work; Concrete Gravity Wall is included at the Gail Smith Res, to ensure long term stability of the residential area. Class II/III is included for ditch construction were called for in the plans and as directed by the ENGINEER. Temporary Debris Barrier Wall is included to protect residential areas from potential damage during slide excavation activities. Chain Link fence is included to be installed above retaining walls. Subdrains are included for saturated areas within the disturbed areas that need to be stabilized. Retaining wall Subdrains are include behind retaining walls for long term stability. Temporary Pipe is included as needed for temporary drainage controls. Filter Fabric and Geo-grid are included to be installed as directed behind proposed walls and ditches to facilitate long term stability of these features. Filter Fabric and Geogrid are included also to address saturation areas that require access over these areas. Silt Control bid items include Silt Barrier - Bales & Fence & Silt Trap - Type A & B. Question Deadline 08/09/2026 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer.
GC Bidding
$1,500,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.