Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 7, 2026 at 8:00 PM
Updated August 16, 2026
Renovation of a military facility in Confluence, Pennsylvania. Completed plans call for the renovation of a military facility.
Removal and replacement of the existing exterior wall cladding system at the Resource Managers Office (RMO) building. Work includes removing and disposing of all existing 5/8-inch cedar-faced T1-11 plywood siding and 1/2-inch asphalt-saturated fibrous sheathing. A new exterior wall assembly shall be furnished and installed consisting of 1/2-inch APA-rated structural wood sheathing, a continuous weather-resistive barrier (WRB), 3/8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding. The assembly shall maintain an overall wall thickness of approximately 1-1/8 inches to align with existing window and door openings. Existing windows and doors shall remain in place and shall not be reset, relocated, or modified. Furring strips shall be installed vertically over the WRB at a maximum spacing of 16 inches on center and fastened through the sheathing into wall framing members. Fiber cement lap siding shall be installed horizontally over the furring strips and fastened through the furring and sheathing into wall framing members. The contractor shall ensure that all fiber cement siding edges are supported by framing members or approved blocking in accordance with manufacturer requirements. All required fiber cement trim shall be furnished and installed at windows, doors, corners, and transitions. The existing cedar hand railing on the balconies shall be replaced with new capped PVC or capped composite decking material of a color matching the fiber cement siding. The contractor shall also furnish and install complete flashing systems, including head flashing at windows and doors, Z-flashing at horizontal joints and transitions, and kick-out flashing at roof-to-wall intersections. All flashing shall be integrated with the WRB in a shingle-lap manner to maintain a continuous drainage plane. The work shall be completed within 180 days after issuance of the written Notice to Proceed. The Method of Contractor Selection has not been determined at this Time
GC Bidding
$1,200,000.00
Public - Federal
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2026
October 19, 2026
497 Flanigan Rd, Confluence, PA
Related To This Project
Confluence, PA
Bid Date: Aug 18 2026
Confluence, PA
--
Confluence, PA
--
Confluence, PA
--
Confluence, PA
--
Confluence, PA
Bid Date: Jun 17 2026
Confluence, PA
Bid Date: Jun 01 2026
Confluence, PA
Bid Date: May 12 2026
Confluence, PA
Bid Date: Jan 20 2026
Confluence, PA
Bid Date: Jul 08 2025
Confluence, PA
--
Confluence, PA
Bid Date: Apr 04 2022
Confluence, PA
Bid Date: Apr 04 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
