BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 6, 2026 at 8:00 PM

Updated August 9, 2026

This is a service / maintenance or supply contract in Cannelton, Indiana. Contact the soliciting agency for additional information.

Removal of two culvert valve assemblies, fabrication and delivery of two new culvert valve assemblies, and installation of two culvert valve assemblies located on the river wall of the main lock chamber (1200 ft chamber). A culvert valve assembly includes a strut arm, bell crank, culvert valve, pins, valve bearing block assemblies, and other ancillary items as shown on the plans. Work includes removal of the existing assemblies highlighted in the plan set, possible disposal of the removed culvert valves, unwatering of the culvert valve chamber, maintaining the unwatered condition throughout installation, and rewatering of the culvert valve chamber after completion. The work is within the scope of fabrication of parts and refurbishment services for civil projects. The disclosed magnitude of construction is between $5,000,000 and $10,000,000. Location: Cannelton Lock and Dam, Cannelton, Indiana. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

$10,000,000.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
57
Bidding Soon
914
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2026

October 7, 2026

Project location map

5281 E. State Road 66, Cannelton, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.