Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 1, 2026 at 8:00 PM
Updated September 3, 2026
Site work for a road / highway in Denver, Colorado. Completed plans call for site work for a road / highway.
Reference Number 0000432037 The primary goal of this project is to reconstruct aging infrastructure, and improve safety and operations for freight, single-occupancy vehicles (SOVs), and multimodal traffic within the limits of the Town of Wellington. It is expected; this project will meet this objective without impacting the nearby Box Elder Floodplain. It is important to note that this goal will initially be broken into two efforts. First, the selected firm will work with CDOT and Local Agencies to plan and select an interchange and footprint at I-25/CO 1 and 1-25 Frontage Roads. This initiative will address aging infrastructure and focus on comprehensively improving operations and safety of the interchange, while mitigating environmental, utility, right-of-way (ROW), and floodplain impacts. It will also consider and implement regional and local planning/development plans . This effort will set the project up for success regarding the CDOT Procedural Directive 1601.1 (PD 1601.0) process and FHWA'S Interchange Modification Request (IMR) or Minor IMR (MIMR). Second , the selected firm will work with CDOT and Local Agencies to design a dedicated separated grade pedestrian crossing at 1-25 between the Box Elder Creek crossing and the CO 1 interchange. This infrastructure is designed to bridge the physical gap and disconnect currently existing between Wellington's residential neighborhoods and its commercial zones. By establishing a safer crossing, the project will enhance local mobility, encourage multi-modal transportation, and foster a more cohesive, walkable community. CDOT will initially execute a task order for 30% Interchange Design and Planning, along with 100% Design for the Separated Grade Pedestrian Crossing . The Separated Grade Pedestrian Infrastructure project is expected to be a DBB delivery method . If the project delivery method changes to an innovative delivery method , the consultant role may change in accordance with the selected delivery method. CDOT will later execute a task order with the selected firm to provide design services as needed during the construction of the pedestrian infrastructure and/or advance the design of the Interchange to 100%. The Project delivery method and the consultant's role for the advanced interchange design will be determined at that time. Question Deadline 08/13/2026 at 12:00 PM MT All questions regarding this solicitation process must be submitted on online Direct by the deadline detailed in the Key Events Schedule
GC Bidding
$6,000,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2026
January 4, 2027
I-25, Denver, CO
Related To This Project
Denver, CO
Bid Date: Aug 21 2026
Denver, CO
Bid Date: Sep 03 2026
Denver, CO
Bid Date: Aug 25 2026
Denver, CO
Bid Date: Sep 11 2026
Denver, CO
Bid Date: Aug 28 2026
Denver, CO
Bid Date: Aug 18 2026
Denver, CO
--
Denver, CO
Bid Date: Sep 04 2026
Denver, CO
Bid Date: Sep 23 2026
Denver, CO
Bid Date: Aug 29 2026
Denver, CO
Bid Date: Aug 31 2026
Denver, CO
Bid Date: Aug 17 2026
Denver, CO
Bid Date: Sep 04 2026
Denver, CO
Bid Date: Aug 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
